Laserfiche WebLink
MOUNTAIN HOUSE NEIGHBORHOOD' 'PROJECT INITIAL STUDY <br /> Chapter VII <br /> REPORT PREPARATION <br /> The prime consultant for preparation of this Initial Study was Amy Skewes-Cox,AICP. She was assisted by other <br /> specialists for specific sections of the Initial Study,as listed below. <br /> Amy Skewes-Cox,AICP: All sections except those listed below for other specialists <br /> P.O. Box 422 <br /> Ross, CA 94957 <br /> Dowling Associates: Transportation <br /> 180 Grand Avenue <br /> Oakland, CA 94612 <br /> Mr.John Dowden <br /> Environmental Collaborative:Biological Resources <br /> 1268 64"Street <br /> Emeryville, CA 94608 <br /> Mr. Jim Martin <br /> Illingworth&Rodkin, Inc.:Noise and Air Quality <br /> 85 Bolinas Road <br /> Fairfax, CA 94930 <br /> Mr. Rich Illingworth and Mr.James Reyff <br /> Questa Engineering: Hydrology and Water Quality <br /> 1220 Brickyard Cove Road, Suite 260 <br /> Pt. Richmond, CA 94807 <br /> Mr. Sid Temple <br /> The Initial Study consulting team was assisted by Mr. Michael Hitchcock, Project Manager for the <br /> Mountain House New Community, San Joaquin County Community Development Department. <br /> C:1J0BMCVNMAL MMYT NALMMALMMY•PART2.DOC(7a0100) 125 VII. REPORT PREPARATION <br />