Laserfiche WebLink
W.O.# NW1-2348554 <br /> Tanknology Inc. <br /> 11000 N.MoPac Expressway.Suite'300 Austin.TX 78759 (800)964-0010 Policy 100-29-A <br /> JOB CLEARANCE FORM&SITE SAFETY CHECKLIST—OVF Rev:G <br /> Rpvised:2/11/2019 <br /> Site Name/x: Street Address: W.O.^" <br /> 7-11 1707 1� tJ. aux i ,4 �s <br /> Arrival Time: Departure Time: Travel Time: hers on site: Date <br /> ILO <br /> Scope of Work and Tasks Performed(JSA's must be available for all tasks): <br /> W 6 <br /> Repairs to Equipment or Parts Provided: , <br /> Follow-up actions required;equipment isolated;comments: q <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED Check.*'items used or mark-if nota licab/e <br /> Safety Vest Safety Glasses Gloves J Hearing Protection <br /> 1� Steel Toe Boots r' Splash Goggles ❑ Hard Hat ❑ Other <br /> ✓ PRE-TEST PROCEDURES Check , each item completed or mark - if notapplicable) <br /> 1. Discuss safety procedures with site personnel. Nearest hospital: vG Z ?49 /N-mC.Q <br /> 2. Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. Secure entire work area with barricades(cones,flags,and extension bars,caution tape,pennant flags,or other perimeter guard). <br /> 4. Place fire extinguishers and"No Smoking"signs in the work area. <br /> 5. Confined Space Entry-If required complete separate CSE Checklist. If NO CSE REQUIRED check the following reason: <br /> []No CS's ❑CS's not opened []No entry only visual ❑No entry-used tools []Work from prone position w/o risk of falling in <br /> 6. ❑ Implement Lockout/Tagout per API 1646(when accessing product piping during tasks) <br /> ❑ secure nozzles with"Out of Service"bags and nylon ties. ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> ❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet"connector from the STP(s). <br /> All applicable equipment disabled during test(s). Verify LOTO is complete by trying to operate pumps. <br /> SIGN IN Lead Technician Name Lead Technician Sig(lature <br /> General Safety Checks: <br /> All site personnel have been informed. <br /> Is a fuel delivery due today? Site Representative Name a presentative Signature <br /> LOTO procedures have been discussed. /,41Z"Vf <br /> Work areas barricaded to protect workers,staff&public. <br /> ✓ POST-TEST PROCEDURES(Check✓each item completed or mar - if not applicable) <br /> 1. - Remove all"Lockout/Tagout"devices and nozzle bags/ties. <br /> 2. Run all pumps and verify there are no leaks: - Impact Valve Test Ports under dispensers <br /> - Leak Detector Threads on STP's - Functional Elements&Relief Screws <br /> 3. Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: L1_ L2_ L3_ L4_ L5_ L6 <br /> 4. g(Check following components operational: - ATG probes,sensors,&caps <br /> - Ball floats,dry breaks&caps Cathodic protection operational <br /> AC Containment sumps are dry - Dispensers&POS operational <br /> - Dispenser panels are replaced p(Drop tubes,flapper valves,fill adapters Widaps <br /> - Leak detectors&vent tubes ,'Manhole covers and sump lids <br /> 'Monitoring system is operational - Shear valves are open LL <br /> - Siphon lines and manifold valves open QGSpill containers&drain valves t <br /> - STP fittings and bayonet connectors - Vents&Extractors(not capped,pluggeipor isolated) <br /> 5.X Remove barricades. <br /> SIGN OUT&Operator Verification of Work(OVF) Lead Technician Name S�aci Technician Signature <br /> J <br /> General Safety Checks: <br /> Work area has been left clean&safe. 6 L1 B7xS <br /> Site staff aware of work status including any remaining isolation. Site Representative Name to Representative azure <br /> Changes to equipment are documented and communicated. <br /> All incidents,near incidents,and unsafe situations reported. JCG <br /> Site Representative Comments: <br /> COMPANY CONFIDENTIAL ©Tanknology Inc.,2019.All Rights Reserved. <br /> rimed copies of this document are uncontrolled. The current version is available in the Tanknology On-Line Document Control S stem. <br /> I <br />