My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (MAY)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (MAY)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:38 PM
Creation date
6/21/2022 2:10:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (MAY)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ekienvironment <br />& water <br />Soil Management Plan <br />Former Pilkington North America Site <br />500 East Louise Avenue <br />Lathrop, California <br />Table of Contents <br />1.0 INTRODUCTION............................................................................................... <br />1-1 <br />1.1 <br />Background................................................................................................. <br />1-1 <br />1.2 <br />Site Setting.................................................................................................. <br />1-2 <br />1.2.1 Geology........................................................................................ <br />1-2 <br />1.2.2 Hydrogeology...............................................................................1-2 <br />1.3 <br />Environmental Conditions.......................................................................... <br />1-3 <br />1.3.1 Previous Environmental Investigations and Remediation........... <br />1-3 <br />1.3.2 Identified Chemicals of Concern .................................................. <br />1-5 <br />1.4 <br />Soil Screening Levels................................................................................... <br />1-6 <br />1.5 <br />Site Redevelopment Activities.................................................................... <br />1-7 <br />1.6 <br />Applicability of this SMP............................................................................. <br />1-7 <br />2.0 SUBSURFACE CONSTRUCTION MANAGEMENT PROTOCOLS ............................. <br />2-1 <br />2.1 <br />Construction Impact Mitigation Measures ................................................. <br />2-1 <br />2.2 <br />Management of Previously Unknown Waste Pits ...................................... <br />2-1 <br />2.3 <br />Management of Visibly Stained or Odorous Soil ........................................ <br />2-2 <br />2.4 <br />Waste Characterization.............................................................................. <br />2-4 <br />2.4.1 Characterization of Soil Excavated From Waste Pits ................... <br />2-4 <br />2.4.2 Characterization of Excavated Visibly Stained or Odorous Soil... <br />2-4 <br />2.4.3 Characterization of Excavated Soil with Surface Glass and Concrete <br />..................................................................................................... <br />2-4 <br />2.4.4 Other Potential On -Site Reuse Soils ............................................ <br />2-5 <br />2.5 <br />Import Fill.................................................................................................... <br />2-5 <br />2.6 <br />Personal Protection/Safety Procedures..................................................... <br />2-5 <br />2.7 <br />Reporting.................................................................................................... <br />2-6 <br />3.0 REFERENCES....................................................................................................3-7 <br />FIGURES <br />Figure 1-1 Site Location Map <br />Figure 1-2 Current Site Layout and Areas of Known Environmental Impacts <br />Figure 1-3 Site Redevelopment Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.