My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (MAY)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (MAY)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:38 PM
Creation date
6/21/2022 2:10:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (MAY)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXCAVATION AND MATERIAL <br />MANAGEMENT PLAN <br />MURPHY PARKWAY PROPERTY <br />APN 198-012-009 <br />17100 Murphy Parkway <br />Lathrop, San Joaquin County, California <br />TABLE OF CONTENTS <br />1.0 INTRODUCTION ............................................................................................................................................. 1 <br />2.0 SCOPE OF THE EMMP ................................................................................................................................... <br />2 <br />3.0 SITE LOCATION AND DESCRIPTION ........................................................................................................ <br />2 <br />4.0 BACKGROUND INFORMATION .................................................................................................................. <br />3 <br />4.1 Site History ................................................................................................................................................... <br />3 <br />4.2 Summary of Past Investigations and Onsite Work Related to Solid Waste Materials .................................. <br />3 <br />5.0 PLANNED CONSTRUCTION ACTIVITIES .................................................................................................. <br />4 <br />6.0 WASTE EXCAVATION AND MATERIALS MANAGEMENT ................................................................... <br />5 <br />6.1 General .......................................................................................................................................................... <br />5 <br />6.2 Notification ................................................................................................................................................... <br />5 <br />6.3 Excavation Plan ............................................................................................................................................. <br />5 <br />6.4 Verification Sampling and Laboratory Testing ............................................................................................. <br />6 <br />6.5 Testing/Characterization of Removed Waste Materials ................................................................................ <br />7 <br />6.6 Evaluation of Removed Wastes for Onsite Reuse ......................................................................................... <br />7 <br />6.7 Removal/Offsite Disposal of Any Unacceptable Materials Identified at the Property .................................. <br />9 <br />6.8 Personal Protection/Safety Procedures .......................................................................................................... <br />9 <br />7.0 RECORD KEEPING AND REPORTING ...................................................................................................... <br />10 <br />8.0 CHANGES OR REVISIONS TO THIS PLAN .............................................................................................. <br />10 <br />ATTACHMENTS: <br />Plate 1, Vicinity Map <br />Plate 2, Site Map <br />Plate 3, Planned Development Drawing <br />Appendix — AGE Site Maps, Trench Logs, and Cross Section of Capped Waste Area <br />BruscaAssociates.com • P.O. Box 332, Roseville, CA 95661 • Phone (916) 677-1470 <br />
The URL can be used to link to this page
Your browser does not support the video tag.