My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
1601
>
1900 - Hazardous Materials Program
>
PR0541978
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 4:10:48 PM
Creation date
6/22/2022 8:57:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0541978
PE
1919
FACILITY_ID
FA0023824
FACILITY_NAME
Subway Franchise #67296
STREET_NUMBER
1601
Direction
S
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
1601 S LOWER SACRAMENTO RD
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample <br /> Employee Training Sign in Sheet <br /> The following topics have been addressed: <br /> 1. Emergency Response/Contingency Plan training. <br /> 2. Spill notification procedures. <br /> 3. spill response procedures. <br /> 4. Evacuation procedures. <br /> Printed name <br /> Signatu re Date <br /> 01 f3 2.2T <br /> DEOL 2 <br /> � cfluf� <br /> 5CA <br /> Turn ' <br /> a <br /> nr r t <br /> 01 �' <br /> Business plans shall include provisions for ensuring that appropriate personnel receive initial and annual <br /> refresher training. All employees shall be trained in safety procedures in the event of a release or <br /> threatened release of a hazardous material, including, but not limited to, familiarity with the following <br /> plans and procedures: <br /> (A) Immediate notification contacts to the appropriate local emergency response personnel and to the <br /> unified program agency. <br /> (B) Procedures for the mitigation of a release or threatened release to minimize any potential harm or <br /> damage to persons, property, or the environment. <br /> (C) Evacuation plans and procedures, including immediate notice, for the business site, <br /> This training shall be documented electronically or by hard copy and shall be made available for a <br /> minimum of three years. <br /> Immediately provide employee training for appropriate personnel and submit a copy of the training <br /> records to the EHD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.