My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:38 AM
Creation date
6/22/2022 4:27:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: SB Gas Market 515 W 11t'St Tracy CA 95376 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . 8. .4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X <br /> *PIPING* X . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> (ARROWS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Drawing ofpiping <br /> exit of sump and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> UDC's.No . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> underground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> drawing is 6. }{ 5. .. 2. X 1 <br /> accurate,we <br /> cannot speculate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> blueprints. <br /> (J > . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . 87 91 . . . . . . . . . . . . . . . . . . <br /> X <br /> T A . . . . . . I . . . . . . . <br /> T <br /> . . I . . I . I . . . L X o . . . . . . . . . . . . . . ATG O <br /> . . . . . . . . . s� F .CAS. <br /> . . . O O . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . .00.0 VENTS. . . . . <br /> X <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . KEY <br /> . O DSL A=ANNULAR Sensor <br /> P F=FILLS <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . V=VAPOR <br /> O " . . . . . . . . . . . . . . . . . P=PROBE <br /> F L=Turbine/Leak Detector <br /> . . . . . . . . . . F . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> . . . . . . . . . . B=Brine Sensor <br /> S=Smart Sensor <br /> C=Floats&Chains <br /> Any items underground that are not visible to the certifying technician area E=E Stop <br /> professional opinion only and are solely for informational purposes. Drawing <br /> not to scale <br /> Date map was drawn 7-28-20 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.