Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information,you may include it,rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment <br /> if installed: 1) monitoring system control panels, 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> USTMon;torim Sft Plan <br /> Ste Address SB Gas Market 515 W 111h St Tracy CA 95378 <br /> 8 .4._ <br /> X — X <br /> +PIPL\G+ <br /> (ARROWS) <br /> Dranina of piping . . . . . . . . <br /> exit of sump and . . . . . . . . <br /> LDCs.No . . . . . . . <br /> undete:otutd <br /> dratv:n.-is 6. <br /> ucurate,tsre <br /> cannot speculate <br /> blue prints- <br /> . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> T . . . . . . . . . . . . . . - <br /> S7 91 . . . . . . . . . . . . . <br /> T - <br /> TA . . . . . . . . . . . . . . <br /> _ ATG <br /> P <br /> c <br /> 000 tfFf9Ts <br /> KEY <br /> O DSL A=4,1erm R Sensor <br /> p F=FILLS <br /> V=VAPOR <br /> P=PROBE <br /> F L=Turbine Leak Detector <br /> F S=SP]IP SFNS <br /> B=Brine Sensor <br /> S=Smart Sensor <br /> C=Floats&Chaim <br /> AT-item.;undara ound tits:ara no:rcr3la so the certt6.7rg technician ala a E=E Stop <br /> prq&:-ionai opution orr�;and me soisl c lbr niformarionai pwpo:fz. Drmrfng <br /> trot to:ca:a <br /> Date map was drawn 7-28-20 <br /> Instructions <br /> If you alreazy have a diag-am that shows ail required information,you may inclue=_a.rather than this page,with your Monitoring System Certfication. On your sae plan. <br /> show t^ zeneva layout of tanks and pipirg. Cieady identify locatons of the following equipment,ifinstalled.moniWring system zc^f,z l panels;sensors tnon,iorr.;tank <br /> annuls,spaces,scraps,eispenser pans,spill containers,or other eeccrdary cont:nmevt areas mecha�ical or eiecaronic line leak ceternors:and in-task liqu a leve <br /> probes(if used Ic r eak detect:onj, la the scac-prorced,note the date this Site Plan was prepared. <br /> LEGEND <br />