Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: 7/17/2019 <br /> If you already have a site plan that shows all required information,you may include it rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (If used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring ventpiping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent4ransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> siMAd&m: SB Gas Market 515 W 11'h St Tracy CA 95376 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 8. X .a X <br /> iPIPLN G <br /> (ARROITS) - . . <br /> Dra%-,=of piping . . . . . . . . . . . . . . . . . . . . <br /> exit of sump and . . . . . . . . . . . . . . . . <br /> UDC's.`:c . . . . . . . <br /> undersiound . <br /> We cannot <br /> speculate blue <br /> prints. <br /> V . . . <br /> 8GAT91 <br /> T <br /> CAS. <br /> P <br /> c <br /> .000 VENTS <br /> 6j <br /> 4=ANNULAR <br /> DSL a F=FU-LS <br /> T=TL KBINE <br /> �r P=PROBE <br /> F V_VAPOA <br /> . X=SUMP SENSOR <br /> L=PLL D <br /> - �I=.1lanwav <br /> B=Brine 5emor <br /> Ary item.:undotgroundAin aro not t•cibls to the cerrtrrirte tschnfcfan are a S=Smart Sensor <br /> prgfcssionai opinion orr{;mid arF soish for irlform�ionaiF:opose.. �+-mrrtg <br /> oat to scala <br /> Date map was drawn 7!17119 <br /> Instructions <br /> If you alresdy have a diagram that shows a:required Wormation.you rcay include it,rather than this page,with,your Monitoring System Certification. On your site plan. <br /> sham the genera!layout of tanks and piping. Clearly dLntrFV locations of the following equipment,d installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary contanment area.; mechanical or electronic fine leak detectors and in-tank liqu;d level <br /> probes(if used for eak detection). In the space provided,note the date this Site Pan was prepared. <br /> LEGEND <br />