Laserfiche WebLink
S A N J 0 A Q I I I Irl Environmental Health Department <br /> C o u N T AMENDED <br /> 4/6/2022 <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Gemco Ripon Truck Plaza Inc. 1002 E FRONTAGE RD, RIPON March 10, 2022 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 112 CCR 2638, 26416),2715(f) Failure to have properly qualified service technician test leak detection equipment every <br /> 12 months. <br /> OBSERVATION: The annual monitoring system certification and leak detector testing were due by February 2022. <br /> Testing has not been completed and is one month past due. <br /> REGULATION GUIDANCE: These tests are required once every 12 months. <br /> CORRECTIVE ACTION: Immediately schedule these tests and provide 48 hours notification to the EHD. Please be <br /> aware that all EHD staff time associated with a follow up inspection will be billed at our current hourly rate($152). <br /> This is a repeat violation, Class II. <br /> 113 CCR 2637(a-d), 2712(b)(1)(F)Failure to conduct secondary containment testing. <br /> OBSERVATION: Under dispenser containment sumps and product line secondary piping was installed prior to <br /> 8/30/2021 and six month testing was due by February 2022. Testing has not been completed and is one months <br /> past due. <br /> REGULATION GUIDANCE: Secondary containment testing is required six months after installation and at least <br /> every 36 months after. <br /> CORRECTIVE ACTION: Immediately schedule this test and provide 48 hours notification to the EHD. <br /> This is a repeat violation, Class II. <br /> 122 CCR 2712(f)Failure to implement corrections and submit written response within 30 days of receiving the report. <br /> OBSERVATION: Inspections were conducted on 6/24/2021, 6/29/2021, and 9/23/2021 and inspection reports were <br /> issued identifying information to be submitted to bring this site into compliance. This information was required to be <br /> submitted by 7/24/2021, 7/29/2021, and 10/23/2021. No follow up was provided for the 6/24/2021 inspection.The <br /> 6/29/2021 inspection has a return to compliance date of 8/30/2021. This has resulted in a non-compliance status for <br /> this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a repeat violation, Class II. <br /> FA0000650 PR0231604 SCO01 03/10/2022 <br /> EHD 23-01 Rev.12/06/2021 Page 7 of 10 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />