Laserfiche WebLink
S A N J 0 A Q I I I Irl Environmental Health Department <br /> C O U N T AMENDED <br /> 4/6/2022 <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Gemco Ripon Truck Plaza Inc. 1002 E FRONTAGE RD, RIPON March 10, 2022 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator inspections for the following months were performed more than 30 days <br /> after the previous inspection: <br /> - Initial inspection on 12/17/2021,there are no following inspections performed (83 days late). Per Khoja Siddiqi, <br /> Rob Neimeyer is their DO and must have taken the files with him. <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection. <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> This is a repeat violation, Class II. <br /> 319 CCR 2635, 2637.2,2665, 2712 Failure to comply with overfill prevention equipment requirements. <br /> OBSERVATION: Overfill prevention testing was due on October 2021 and has not been conducted. <br /> REGULATION GUIDANCE: Overfill prevention equipment inspections were required to be conducted by October <br /> 13, 2018, and every 36 months thereafter, and within 30 days of completion of a repair. <br /> CORRECTIVE ACTION: Immediately schedule this testing and provide 48 hours notification to the EHD. Ensure all <br /> future testing is conducted within required time frames. <br /> This is a repeat violation, Class ll. <br /> Overall Inspection Comments: <br /> An inspection report was provided to the facility operator on the day of inspection. The report was amended <br /> and replaces the initial report. Violation #102, 105, 202, 203, 205, 319 was added. Violation #108, 110, 207 was <br /> removed. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the amended inspection report. <br /> ******Notes******* <br /> -The UST Owner/Operator Written Agreement exemption description is incorrect. Being in escrow does not <br /> qualify the facility for exemption. The facility is exempt due to the permit holder and tank operator are the same. <br /> - During the inspection, Ramesh Prakask, store manager, stated the business name and/or owner/operator <br /> changed as of October 2021. According to the last CERS submittal, 1/2022, Kulwinder Johal is listed as the <br /> owner of Gemco Ripon Truck Plaza Inc. <br /> - Per Ramesh Prakask, Store Manager, and Khoja Siddiqi, Store Supervisor, Andy BP Inc. is the new facility <br /> operator and a owner/operator written agreement is needed. <br /> FA0000650 PR0231604 SCO01 03/10/2022 <br /> EHD 23-01 Rev.12/06/2021 Page 9 of 10 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />