My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:59:31 PM
Creation date
6/29/2022 2:37:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST i <br /> Test Method Developed by C Manufacturer 'x7 Industry Standard Tr=l Professional Engineer <br /> Test Type 'D Pressure Vacuum r!i Hydrostatic <br /> Test Equipment Used: vacuum gauge 0-60" <br /> i Tank ID #1 regular, #2 super/split tank <br /> an Manufacturer Modern Welding <br /> Tank Capacity 12,000/ 8,000 <br /> Test Start Time 10:17 am <br /> Initial Reading 10" vacuum <br /> Test End Time <br /> 1117 am <br /> Fina! Reading 10" vacuum f <br /> Change in Reading 0 <br /> Pass/Fail Criteria izeroloss <br /> Tightness Test Results SO Pass i Fail ! [ Pass [ Fail C Pass C Fail Pass '; Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by E Manufacturer Industry Standard ,j Professional Engineer <br /> Test Type R Pressure Vacuum 1 Hydrostatic <br /> Test Equipment Used: pressure gauge 0-30 psi <br /> Pipe Run ID regular super <br /> Pipe Manufacturer NOS NOS <br /> Test Start Time 10:17 am 11:50 am <br /> Initial Reading 5 psi 5 psi <br /> Test End Time 11:17 am 12:50 pm <br /> Final Reading 5 psi 5 psi <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria zero loss zero loss <br /> Tightness Test Results (x Pass Fail Pass Fail ! C Pass j-1 Fail =Pass ! Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> I Test Start Time <br /> Initial Reading <br /> I Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results C Pass [ Fail C Pass [ Fail ' fes( Pass C Fail ! E Pass ''l Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail- and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.