Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by [ Manufacturer F_ Industry Standard 77 Professional Engineer <br /> i <br /> Test Type L Pressure [ Vacuum Hydrostatic <br /> Test Equipment Used: Caldwell system <br /> Sump/UDC ID 11-12 9-10 <br /> Sump Manufacturer S Bravo S Bravo <br /> Sump Depth (inches) 28" 28" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 8° 8" <br /> Test Start Time 2:15 pm 2:15 pm <br /> Initial Reading 12" , 12° <br /> Test End Time 2:45 pm 2:45 pm <br /> i Final Reading 12" 12" <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 2 2 <br /> Tightness Test Results FSF Pass Fail i z Pass [ Fail 7 Pass l i Fail EF] Pass Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of I <br /> Highest Pipe Penetration <br /> (inches) <br /> i Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> [Tightness Test Results Pass Fail 77 Pass 1,7? Fail h Pass C Fail Pass 77 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked Fail" and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />