Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. )VERFILL PREVENTION EQUIPMENT DETAILS — —— <br /> Tank ID (one OPE per column} regular super <br /> Are both vent and tank riser piping j Yes Yes L7 Yes Yes <br /> secondarily contained? No 117 No ( No No <br /> OPE Model OPW 61 SO / 71 SO <br /> What is the OPE response when Shut off Shut cuff Shut off I Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) restricts M—Restricts Restricts Restricts <br /> Flow Flow Flow Flow <br /> Audible E Audible Audible " Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual Visual r Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flaw Testi ictors installed on vent piping ` Yms` C Yes% Yee Yes* <br /> that may interfere with the OPE operation? 11 No No "` No !r7i No <br /> At what level in the tank is the OPE set to _ <br /> activate? (inches from bottom of tank) 96.5" 95.875" <br /> What is the percent capacity of the tank at ' 90% 90% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to Yes Yes* Yes _ Yes* <br /> respond when the stored substance 7r7i No No ifl No i No <br /> reaches the designated regulatory level? <br /> J. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results Pass Pass ii Pass Pass <br /> 1, Fail Fail IM Fail Fail <br /> 8. COMMENTS <br /> Descrbe all answers marked "No"or"Fail"and proposed remedy. --- <br /> List all monitoring equ4pment either replaced or repaired. <br /> * Marls here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this,cage may be attached. - <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup reports) <br /> Page 2 of 2 <br />