Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for AISLE 1 #2356 as of October 18 , 2022 . <br /> Open violations from July 13 , 2022 inspection <br /> Violation #208 - Failure to comply with the designated operator inspection requirements . <br /> OBSERVATION: The designated operator failed to check and note the correct test dates for the overfill test in the <br /> designated operator inspection reports . From 12/31 /2021 to 6/20/22 , overfill test date was not noted . The correct <br /> date for overfill testing is 7/ 10/2018 . <br /> REGULATION GUIDANCE: During the inspection , the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION : Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports . <br /> OBSERVATION Designated operator reports were not signed within the required time frame . <br /> -The 2/25/2022 designated operator report was not signed by the owner/operator . <br /> REGULATORY GUIDANCE Within 48 hours of the completion of the designated UST operator visual inspection , <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues . <br /> CORRECTIVE ACTION : Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #304 - Failure to construct, operate , and maintain primary containment as product-tight. <br /> OBSERVATION A pipe in dispenser 5/6 has drip , indicating a leak in the primary containment. <br /> REGULATION GUIDANCE: All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION: Immediately have a properly licensed , trained , and certified contractor repair or replace the <br /> failed component(s ) , under permit and inspection of the EHD if necessary . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 1 of 1 <br />