My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004853
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7999
>
2600 - Land Use Program
>
PA-0200409
>
SU0004853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:16:24 PM
Creation date
7/1/2022 4:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004853
PE
2611
FACILITY_NAME
PA-0200409
STREET_NUMBER
7999
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
APN
24808014, 16, &
ENTERED_DATE
2/22/2005 12:00:00 AM
SITE_LOCATION
7999 W LINNE RD
RECEIVED_DATE
2/25/2002 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTIONember.4TRO DISTRICT <br /> Compliance Assistance Bulletin <br /> Asbestos Synopsis <br /> F <br /> s Delmohtion/Renovation-Summary: <br /> any rano" tp ion or demolition of a facility <br /> onduct an asbestos inspscd° °f the site before: <br /> of building materials, or 260 linear feet of pipe insulation will be disturbed, or <br /> ■ Any renovation in which 160 sq. <br /> ■ Any demolition of a facility with or without asbestos-containing materials <br /> Notif : Submit an asbestos notification form for any regulated renovation or demolition, 10 working days before the activity. <br /> Fes: Fees must be paid to the District with the notification for all regulated renovations and demolitions. <br /> on release <br /> n its <br /> oval by the <br /> Demolition Release Form: Prior to any demoliroof (neededsby the building official) of compliance form, <br /> compl ancew h, orroexempnon from, the <br /> District this signed form may be used as p <br /> NESHAP notification requirements. <br /> Submit this form to the building department with your application for a demolition permit. <br /> r <br /> pplicability <br /> re <br /> cilities subject to the Eequipment.Pated fa ilitie ) include <br /> dwellings be exempt cial Ilbut gonly onrta case byments tcaseobasisan 4 units, other <br /> ructures and non-portable <br /> Demolitions subject to the NE-S.1-M!" (regulated demolitions) are demolitions of facilities described above, whether or not asbestos <br /> ,s present. <br /> which 160 sq. ft. of regulated asbestos-containing building materials or 260 linear <br /> Requested renovation applies to any activity in <br /> feet of asbestos-containing pipe insulation is disturbed at a regulated facility. <br /> Asbestos Notification and:inspection Requirements <br /> Definitions: <br /> Facilities: Facilities subject to the rule include "all structures, installations, buildings and equipment, <br /> except for single family dwellings and apartments with four or fewer dwelling units." <br /> Single family dwellings and apartments are also subject to the regulation if: <br /> ■There is more than one building at a site being renovated or demolished, or <br /> een used for, or is being removed for a commercia <br /> ■The building had bl or public use, or <br /> is to be used as a training burn exercise. <br /> Demolition: In addition to the total destruction of a structure, demolitions include "the removal of any <br /> structural load-bearing member from a facility together with any related handling <br /> operations or the intentional <br /> othe loeparration g of aobuadi59uct(training <br /> fromburns <br /> its founconducted <br /> dation bpriorfire <br /> to <br /> fighting agency(. <br /> relocation is a demolition. <br /> Renovation: Altering a facility or one or more facility components in any way, including the stripping <br /> or removal ac regulated asbestos containing material (RACM) from a facility component. <br /> Renovations include all activities in which asbestos could be disturbed ata regulated <br /> facility, including the clean up and removal of debris from buildings which have burned. <br /> JM h:\cegajoan\asbstosl.syn <br />
The URL can be used to link to this page
Your browser does not support the video tag.