My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004853
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7999
>
2600 - Land Use Program
>
PA-0200409
>
SU0004853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:16:24 PM
Creation date
7/1/2022 4:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004853
PE
2611
FACILITY_NAME
PA-0200409
STREET_NUMBER
7999
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
APN
24808014, 16, &
ENTERED_DATE
2/22/2005 12:00:00 AM
SITE_LOCATION
7999 W LINNE RD
RECEIVED_DATE
2/25/2002 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Jennifer Johy <br /> October 2, 2002 <br /> Page 2 <br /> This truck hauling route is along the portion of Linne Road which will provide the <br /> only access to the proposed 77-unit subdivision Project. The Project proposes two <br /> access roads from the Project to Linne Road in this area. <br /> Please note that the Tracy Rock Plant is permitted to operate 24 hours daily. Trucks <br /> regularly arrive and depart from the Tracy Rock Plant throughout the day and during <br /> commute periods. In addition, the area directly to the north of the Tracy Rock Plant <br /> and the permitted quarry property is industrial. In addition to mining there are other <br /> industrial uses in the vicinity which generate truck traffic and industrial noise. The <br /> proposed residential subdivision appears inconsistent with these current neighboring <br /> uses. <br /> If the proposed subdivision is approved, it is essential that adequate mitigation <br /> provisions be imposed. Appropriate conditions should provide safe passenger <br /> vehicle and quarry truck movements along Linne Road. The developer and future <br /> residents should be aware that the proposed subdivision is within close proximity to <br /> the quarry excavations and processing facilities and surrounding industrial uses. If <br /> the Project is approved, conditions should be imposed to mitigate these potential <br /> conflicts. <br /> Please add to your mailing list for this Project, the following: <br /> Randall W. Sater <br /> V.P., Manager, Aggregate Resources Development <br /> Teichert Materials <br /> P.O. Box 15002 <br /> Sacramento, CA 95851 <br /> Lillie O'Keeffe Noble <br /> Project Manager <br /> Teichert Materials <br /> P.O. Box 15002 <br /> Sacramento, CA 95851 <br /> Thomas J. Shephard, Sr. <br /> Attorney at Law <br /> Neumiller&Beardslee <br /> P.O. Box 20 <br /> Stockton, CA 95201-3020 <br /> 345718-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.