Laserfiche WebLink
`PA-02-409 (SU) <br /> Page 2 of 2 <br /> C. Connection to an approved public water supply system is required (San Joaquin County <br /> Development Title, Section 9-1120.2) <br /> a. Test well will be required to meet the following: <br /> 1. Water quality tested to meet Title 22, CCR(Safe Drinking Water Act), requirements. <br /> 2. Water quantity tested to show an adequate source. <br /> 3. Results approved by the Environmental Health Department and County Public Works <br /> prior to final approval of improvement plans. <br /> b. A letter from the water supplier will be required stating that they have the capacity to <br /> serve the development and that the system meets State standards prior to recording the <br /> final map. (San Joaquin County Development Title, Section 9-1100.3). <br />