My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004853
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7999
>
2600 - Land Use Program
>
PA-0200409
>
SU0004853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:16:24 PM
Creation date
7/1/2022 4:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004853
PE
2611
FACILITY_NAME
PA-0200409
STREET_NUMBER
7999
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
APN
24808014, 16, &
ENTERED_DATE
2/22/2005 12:00:00 AM
SITE_LOCATION
7999 W LINNE RD
RECEIVED_DATE
2/25/2002 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br /> Central Valley Region ® fl <br /> Robert Schneider.Chair <br /> Term Tamminen Arnold Schwarzenegger <br /> Secretary for Sacramento Main Office Governor <br /> Environmental Internet Address: http://wwA,.swrcb.ca.gov/rwgcb5 <br /> Protection 11020 Sun Center Drive#200 Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 <br /> ORDER NO. <br /> ATTACHMENTI) <br /> REQUIREMENTS FOR <br /> MONITORING WELL INSTALLATION WORKPLANS AND <br /> MONITORING WELL INSTALLATION REPORTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan <br /> containing, at a minimum, the information listed in Section 1, below. Wells may be installed after staff <br /> approve the workplan. Upon installation of the monitoring wells, the Discharger shall submit a well <br /> installation report which includes the information contained in Section 2, below. All workplans and <br /> reports must be prepared under the direction of, and signed by, a registered geologist or civil engineer <br /> licensed by the State of California. <br /> SECTION 1 - Monitoring Well Installation Workplan and <br /> Groundwater Sampling and Analysis Plan <br /> The monitoring well installation workplan shall contain the following minimum information: <br /> A. Generallrnformation: <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions <br /> Proposed monitoring well locations and rationale for well locations <br /> Topographic map showing facility location, roads, and surface water bodies <br /> Large scaled site map showing all existing on-site wells,proposed wells, surface drainage <br /> courses, surface water bodies, buildings, waste handling facilities, utilities, and major <br /> physical and man-made features <br /> B. Drilling Details: <br /> On-site supervision of drilling and well installation activities <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals (if appropriate) and logging methods <br /> C. Monitoring Well Design (in narrative and/or graphic form): <br /> Diagram of proposed well construction details <br /> - Borehole diameter <br /> - Casing and screen material, diameter, and centralizer spacing (if needed) <br /> - Type of well caps (bottom cap either screw on or secured with stainless steel screws) <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.