My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 4:46:19 PM
Creation date
7/7/2022 8:24:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: KNIFE RIVER 655 CLAY STREET STOCKTON CA 95206 <br /> KEY I-5 HIGHWAY <br /> A=ANNULAR <br /> F=FILLS <br /> T=TURBINE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> V=VAPOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X=SUMP SENSOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L=Leak Detector . . . . . . . . . . . . . . . . . . . . . 6K . . . . . . . . . . . . . . . . . . . . . . . . <br /> M=Manway . . . . . . . . . . . . . . . . . . . . . <br /> B=Brine Sensor , , , , , , . .20K . . . . . . . . . . . . . . . . . . . . . . . <br /> O <br /> I=Smart Sensor n <br /> S=STP 0 <br /> O <br /> C=Floats&Chains n <br /> E=EStop <br /> . . . . . . . O . . . . <br /> E O <br /> .H=HIGH FLOW. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> S=SUCTION . . . . . . . . . . . . . . . . 87 . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . DIE . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . O . . . . . . . . L . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . s7. . . . . . . . . . . V' <br /> x <br /> . . DSL. v � <br /> *PIPING* x <br /> ^C7 <br /> (ARROWS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Drawing ofpiping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> exit of sump and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> UDC's.No . . . . . . . SUCTION LINE. . . . . . . . . . . . . . . . . . . . . . . . . <br /> underground . . . . . . <br /> drawing is accurate, . . . . . TLS <br /> we cannot iso <br /> speculate blue . . . . . <br /> H <br /> prints. . . . . . . . . . . . . . . . . . . . . <br /> .. FLOW LIN <br /> WATER <br /> .AST . . . . . . . . COOLER. . . . . . . . . . ] DIE HIGH PUMP . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> .To Clay Street Entrance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Any items underground that are not visible to the certifying technician are a professional opinion only and are solely for informational <br /> purposes. Drawing not to <br /> Date map was drawn:7/30/21 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.