Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0500702 <br /> Wright <br /> Site Approval Application No. PA-0500702 was approved by the San Joaquin County Community <br /> Development Department on January 6, 2006. The effective date of approval is January 16, 2006. <br /> This approval will expire on July 18, 2007, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Cealy Lein, 468-3136). <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884). <br /> b. APPROVED USE: This approval is for an 95-foot monopole communications cell tower and a 12' X <br /> 20' (240 square foot) equipment shelter, a Generac power generator on a 5' X 10' concrete pad with <br /> a maximum of 12 antennas and 2 microwave dishes, as shown on the Site Plan dated October 7, <br /> 2005. <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2). <br /> d. SETBACKS: The structure shall comply with the following setback requirements: <br /> (1) New freestanding support structures shall be located a distance equal to at least the height of <br /> the said structure from residential structures on adjoining properties. (Development Title Section <br /> 9-1065.4[d]). <br /> e. MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be maintained in good condition by the provider of <br /> the telecommunication facility and, whenever necessary, repaired or replaced. (Development Title <br /> Section 9-1065.7) <br /> f. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and <br /> the site restored to its pre-construction state if said facilities have not been operational or used for a <br /> period of six (6) consecutive months. Removal and site restoration shall be completed within ninety <br /> (90)days of the end of said six (6) month period. (Development Title Section 9-1065.8) <br /> Conditions of Approval - 1 - PA-0500702 <br />