My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
3031
>
2600 - Land Use Program
>
PA-0600211
>
SU0006007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 3:57:41 PM
Creation date
7/7/2022 10:03:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006007
PE
2631
FACILITY_NAME
PA-0600211
STREET_NUMBER
3031
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
APN
23920029
ENTERED_DATE
4/18/2006 12:00:00 AM
SITE_LOCATION
3031 W LINNE RD
RECEIVED_DATE
4/18/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raymond Hoo, Senior Planner -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-06-211 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$216.55 per daily trip-end generated in the Tracy <br /> area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record.)(Resolutions 00-433) <br /> 4. The Regional Traffic Impact Fee as per retail shall be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is$216.55 per daily trip-end <br /> generated in the Tracy area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.)(Resolutions 00-433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. Applicant shall obtain a Storm Water Pollution Prevention Plan <br /> (SWPPP)permit from the State Water Resources Control Board prior to beginning on any construction. <br /> MRC:DG:av <br /> PACOMMENTS\SMYR 2006\PA-060021 I mpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.