Laserfiche WebLink
Raymond Hoo, Senior Planner -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-06-211 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$216.55 per daily trip-end generated in the Tracy <br /> area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record.)(Resolutions 00-433) <br /> 4. The Regional Traffic Impact Fee as per retail shall be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is$216.55 per daily trip-end <br /> generated in the Tracy area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.)(Resolutions 00-433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. Applicant shall obtain a Storm Water Pollution Prevention Plan <br /> (SWPPP)permit from the State Water Resources Control Board prior to beginning on any construction. <br /> MRC:DG:av <br /> PACOMMENTS\SMYR 2006\PA-060021 I mpd <br />