My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014668
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
26255
>
2600 - Land Use Program
>
OX-91-4
>
SU0014668
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 4:12:37 PM
Creation date
7/7/2022 1:13:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014668
PE
2600
FACILITY_NAME
OX-91-4
STREET_NUMBER
26255
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
APN
02324001
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
26255 E BRANDT RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:Describe off-site hauling of sand, aggregate ore, waste, or other <br /> mined material? X Yes No If Yes , specify : <br /> A. Number of one-way truck trips per day : Peak 5 Average3 <br /> B. Number of one-way truck trips per week: Peak 25 Average15 <br /> C . Primary public roads used for hauling : Brandt, Clements, and Highway 88. <br /> Describe proposed on-site and off-site road improvements : <br /> not everywhere; access roads only. <br /> A. On-site Width 241/ Surface crushed rock _ <br /> Location <br /> B. Off-site Width Surface <br /> Location <br /> Describe the mined material recovery process ( type of process , method, <br /> size and type of crushing equipment ) : Washing, screening to different size_ <br /> fractions with concurrent placer gold recovery. attached page 7 for list- of <br /> eggdpu t ) <br /> Location of the recovery process (es ) : on-site <br /> Mining Activities Operating Hours Days of the Week <br /> Blasting <br /> Off-site hauling 6 a.m. to 5 p.m. MQadiu-Friday <br /> O r e extraction 5 a.m. to 5 p.m. Monday-Friday <br /> Crushing/processing 5 a.m. to 5 p.m. Monday-Friday <br /> Other ( specify ) <br /> Industrial water requirements : <br /> Amount required per day 576,000 gallons <br /> Source private well <br /> Source of domestic water : <br /> Private well X Water district (specify which ) <br /> Other <br /> Method of sewage disposal : <br /> Septic system X Sewer district (specify which ) <br /> Holding tank Other portable toilet <br /> Application Form <br /> Quarry Excavation - 4 - ( 3/89 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.