Laserfiche WebLink
RECEIVED BY EHD <br /> 7/18/2022 - during inspection Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 07/06/2021 <br /> ff a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring ganef, and all leak detection equipment and monitoring locations. include <br /> a legend for all symbols depicted. <br /> Y.R. <br /> ALL SUMPS AND JDLAR6LL7AN ICS HAVE 363 ANNULAR <br /> DOUBLE WALL SUMPS W120B SENSORS <br /> SOMPSENSORSM0 3 <br /> fNlERSTIAL SPACE SENSORS. <br /> BUILDING 0 <br /> VENT SUIV P <br /> Leg" <br /> 6 <br /> ____DIESELI pIESEL2 BIO DI ESEc <br /> BIO DIESEL BLENDIPIFING <br /> SUMP <br /> ^a <br /> F7I1f� �ii YK i 4 :.i <br /> LI 41 M=` <br /> E50 (V11 JII ("l <br /> ESO l� <br /> Q m <br /> O0 SP <br /> DEF <br /> Page 6 of 6 <br />