Laserfiche WebLink
RECEIVED BY EHD Underground Storage Tank <br /> 7/18/2022 - during inspection <br /> I Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> DIESEL 1 NORTH DIESEL 2 MIDDLE <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping r. Yes Yes r Yes r Yes <br /> secondarily contained? r No r No r No r No <br /> OPE Model OPW OPW <br /> VShut off ,V Shut off Shut off Shut off <br /> Flow Flow Flow Flow <br /> Restricts Restricts Restricts Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> F Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? l: No No r No r No <br /> At what level in the tank is the OPE set to 110 111 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at 97 97.5 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to r Yes r Yes r Yes r Yes <br /> respond when the stored substance reaches r No No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results r Pass r Pass r Pass r Pass <br /> r. Fail Fail r Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> DROP TUBES NEED REPLACED WITH ONES THAT HAVE PASSING RESULTS. <br /> ALSO UNABLE TO REMOVE T3 BIODSL DROP TUBE TO MEASURE OR TEST FUNCTIONALITY. <br /> *Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />