Laserfiche WebLink
RECEIVED BY EHD <br /> 7/18/2022 - during inspection <br /> 2. Drill 71 SO Parts Diagram <br /> 3. Hammer - Upper Q-Ring Gasket <br /> 4. Tape measure <br /> S. Hacksaw or cut-off saw,fine tooth;24 teeth/inch Screws,Qty 3 <br /> 5. Eine half round file - Inlet Tube <br /> 7, Screwdriver-Phillips blade Poiypak Sea! <br /> 8. Eine grit sandpaper/steel wool <br /> 9. Grease,black moly <br /> 10. Torque Wrench <br /> 11, Band clamp (3-3/4"diameter minimum) <br /> 12. Tlw OLL A10RE. Itlt.y: rivet tool for 1/8"ma n- <br /> drel,crimping tool/pliers,wire cotter/scissors, Upper Drop Tube <br /> pipe dope, 1/4"square drive extension or 3/8" <br /> square drive extension with 3/8"to 1/4"socket <br /> adapter. <br /> 1± IN Valve Body <br /> Using electrically operated equipment near gasoline <br /> or gasoline vapors may result in fire or explosion, <br /> causing personal injury and property damage. - Float <br /> Check to assure the working area is free from such <br /> hazards,and always use proper precautions. <br /> Lower b-Ring <br /> IMPORTANT:The figures in this installation and <br /> maintenance instruction may contain vapor recovery <br /> equipment(including model numbers)that is not certi- <br /> fied by the California Air Resources Board (GARB)for a <br /> specific Phase I Vapor Recovery System. Please refer to <br /> Exhibit 1 of the appropriate CARB Phase I Executive Or- <br /> der for a list of certified Phase I Vapor Recovery System <br /> Equipment. Lower Tu be <br /> rNote. <br /> qmp nen ,-T...�sit V rsicLns <br /> l components are the same except the <br /> daptor&cable assembly.rivet,testable <br /> e,and ferrule. <br /> Socket Adaptor&Cable <br /> Assembly <br /> Rivet <br /> Ferrule <br /> Testable Inlet <br /> Tule c¢ <br /> 3 <br />