My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 12:05:21 PM
Creation date
7/14/2022 8:17:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED BY EHD <br /> 7/18/2022 - during inspection <br /> E BELOW, <br /> FOR 71 SO-TOOL,SEE PAGE 8 7150-TOOLCT <br /> FAIR 71 Sia-TOOLC,SEE PAGE 9 <br /> STEP 9C: INSERT 71SO-TOOLCY OVER INLET TUBE <br /> To install the 71 SO-TOOLCT(sold separately)over the <br /> inlet tube,first loosen the thumb screws,so the tool can 6z <br /> pass freely over the inlet tube flange. Align the slot on <br /> the tool with the key on the inlet tube and insert the ` <br /> tool down. See Figure 9C. Tip to stop dimension must <br /> be 1-3/15"to 1-1/4" <br /> Loosen Figure i 1C <br /> thumb Hand tighten STEP 12C: DRILL HOLES <br /> screws <br /> Tool Slot thumb screws <br /> With the inlet tube and 7150-TOOLCT in place,carefully <br /> _.-.._....-........ drill a 3/16"diameter hole in the upper tube using the <br /> r' }�;•. t :�-.. `.j r;y hole in the 71 SO-TOOLCT as a guide. The drill stop is <br /> -e , '. : l .� i` positioned so it will bottom out against the tool after <br /> the bit has drilled through the upper drop tube. If the <br /> stop positioned wrong either no hole will be drilled, <br /> pis <br /> `—' 1---- J or a through hole could potentially be drilled through <br /> the inlet tube. If no hole is drilled return to step 11 C <br /> and check the stop dimension. If a hole is drilled <br /> - xf through the inlet tube or into the screw hale the assem- <br /> bly is not salvageable, Drill(2)more holes in thetwo <br /> Inlet remaining guide holes. <br /> Tube <br /> Bey <br /> Figure 9C Figure]OC c? <br /> STEP 10C: TIGHTEN THE 71 SO-TOOLCT � <br /> Ensure that the tool seats flat against the tap of the inlet <br /> tube. To prevent vertical movement of the tool during Rrillthrough Lipper tube only <br /> drilling,hand tighten the thumb screws against the up- <br /> per drop tube. See Figure 1 OC. <br /> STEP 11C: PREPARE DRILL AND SIT <br /> Confirm that the stop on the 3/16"drill bit supplied Figure 12C <br /> with the 71 SO-TOOLCT is in the correct position before <br /> drilling. The stop is factory installed at a distance be- <br /> tween 1-3/16"to 1-1/4"from the tip with the 71 SO- <br /> TOOLCT, If the stop is not at the correct position it must <br /> be fixed before drilling. <br /> CAUTION:If the drill stop is not in the proper loca- <br /> tion failure of a pressure decay leak test may result. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.