My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 12:05:21 PM
Creation date
7/14/2022 8:17:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED BY EHD <br /> 7/18/2022 - during inspection •_„____ <br /> LY,FOR STANDARD MOD- STEP 3T: DETERMINE CABLE LENGTH <br /> 1~LS,PROCEED TO NEXT PAGE. Faun cable along upper tube and over the top plate on <br /> the float bracket as shown. With the float in the clown <br /> STEP 11T.- INSTALL SOCKET ADAPTOR ASSY position has shown in Figure 3T)align loop in cable with <br /> Put cable thru threads in inlet tube and out thru cable rivet and top hole in float bracket. Use the rivet as a <br /> port on side of inlet tube. Thread the socket adaptor template to size the loop in the cable and pull cable <br /> assembly finger tight into the inlet tube. Note; theca- tight and crimp ferrule with crimping tool/pliers onto <br /> bie porton the inlet tube must be in line with the float cable at this location. Trim excess cable with wire cut- <br /> as shown previously in Figure 8A. ter/scissors. For reference,from the seam where the <br /> upper tube and valve body meet to the end of the cable <br /> Socket � <br /> aciaptnafter trimming will require approximately 3.5”of cable.�, I <br /> assembly Cable over float bracket <br /> l ( H , <br /> Cable <br /> i� part Seam ; <br /> i <br /> F1.9are3T <br /> Figure 7T STEP 4T: ATTACH CABLE TO FLOAT BRACKET <br /> Ensure cable is over the float bracket. Using the sup- <br /> plied rivet align loop in cable with top hole in float <br /> STEP 2T: PASS CABLE THRU FERRULE bracket and pass rivet thru cable loop and float bracket <br /> Pass cable thru ferrule. Loop cable and then pass cable hole. Using rivet tool for 1/8"dia mandrel attach rivet <br /> back thru ferrule. Keep ferrule loose until cable length and cable to the float bracket. See.last page for list of <br /> is determined in the next step. Note. if cable end frays replacement cable parts, <br /> it may be necessary to trim the cable again to pass thru <br /> ferrule. �. Attach rivet to tap hole <br /> 118"mandrel <br /> rivet <br /> \ 9 <br /> 'l ` Z'�i �'•l - <br /> Ferrule }� <br /> Figure 4T <br /> Trim <br /> cable STEP 5T:ENSURE PROPER CABLE OPERATION <br /> _�--� .~` - <br /> after Unthread the socket adaptor assembly from the inlet <br /> tube and ensure float and poppet move freely when <br /> step 3T Loop socket adaptor assembly is pulled on. It should only <br /> require 3"to 4"of movement in orderto actuate the <br /> Figure 2T float and poppet. Thread socket adaptor assembly fin- <br /> ger tight into inlet tube after testing. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.