My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 6:03:07 PM
Creation date
7/18/2022 8:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
UNFI GROCERS DISTRIBUTION, INC (STOCKTON)
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# NW1-2359397 <br />Tanknology Inc. Policy IM29-A <br />11000 N. MoPac Expressway, Suite 500 Austin. TX 78759 1800) %4-001(, <br />Jl <br />-41 JOB CLEARANCE FORM &SITE SAFETY CHECKLIST - OVF Re" ° , Ir -019 <br />Revised: <br />Site Names � 32� � � <br />/�j#1/^Yf,StreetLet� <br />Acidn±sa: <br />fig O <br />1.IJIMlLN <br />W.U. . J <br />. r '] <br />Amval ime: <br />eparture i <br />rave ime:rrA <br />hers on site <br />ate <br />Scope of Work and TasksP (J(JSA s must be evadable for all tasks) <br />Repairs to Fquilprnao jr Parts Provided, <br />Follow-up actions required, equipmerd isolated; comments: <br />PPE - PERSONAL PRO TE VE EQUIPMENT REQUIRE heck items used or mark - if nota licable) <br />Vest <br />,/steel <br />Safety Glasses <br />_ Gloves <br />_ Hearing Protection <br />,;afety <br />Toe Boots <br />❑ Splash Goggles <br />Hard Hat <br />_ Other <br />✓ PRE-TEST PROCEDURES (Check -"each item completed or mark - if not applicable <br />1. ❑ Discuss safety procedures with site personnel. Nearest hospital: <br />2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br />3. ❑ Secure entire work area with barricades (cones, flags, and extension bars, caution tape, pennant flags, or other perimeter guard). <br />4. ❑ Place fire extinguishers and "No Smoking" signs in the work area. <br />5. ❑ Confined Space Entry - If required complete separate CSE Checklist. If NO CSE REQUIRED check the following reason: <br />No CS's ❑CS's not opened ❑No entry only visual []No entry - used tools ❑Work from prone position w/o risk of falling in <br />6. ❑ Implement Lockout(Tagout per API 1646 (when accessing product piping during tasks) <br />❑ Secure nozzles with "Out of Service" bags and nylon ties. ❑ Secure the circuit breaker(s) with lockout devices and tags. <br />❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical'bayonef connector from the STP(s). <br />❑ All applicable equipment disabled during test(s). ❑ Verify I - TO is complete by bAg to operate pumps. <br />SIGN IN <br />ician ae A <br />----tead Tec m <br />Lead Techrvaan SignatureGeneral <br />Safety Checks: <br />All site personnel have been informed. <br />Is a fuel delivery due today? <br />Site RepresrR5ve Name <br />Sde Represertative Signature <br />LOTO procedures have been discussed. <br />Work areas barricaded to protect workers, staff & public. <br />✓ POST-TEST PROCEDURES (Check ,each item completed or mark - if not aaplicablel <br />1. Remove all "Lockout/Tagout" devices and nozzle bags/ties. <br />2. Run all pumps and verify there are no leaks: Impact Valve Test Ports under dispensers <br />Leak Detector Threads on STP's Functional Elements & Relief Screws <br />3. Install lead wire seal on all test plugs & leak detectors that were serviced. <br />Count LD threads: L1 _ L2 _ L3 _ L4 _ L5 _ L6 <br />4. Check following components operational: ATG probes, sensors, & caps <br />Ball floats, dry breaks & caps Cathodic protection operational <br />Containment sumps are dry Dispensers & POS operational <br />Dispenser panels are replaced Drop tubes, flapper valves, fill adapters & caps <br />Leak detectors & vent tubes Manhole covers and sump lids <br />Monitoring system is operational Shear valves are open <br />Siphon lines and manifold valves open Spill containers & drain valves <br />STP fittings and bayonet connectors Vents & Extractors (not capped, plugged or isolated) <br />5. Remove barricades. <br />SIGN OUT & Operator Verification of Work (OVF) Lead T ry an Na Lead Tacri—an Signature <br />General Safety Checks: <br />Work area has been left clean & safe. <br />Site staff aware of work status including any remaining isolation. ite Representative Name Site Representative Signature <br />Changes to equipment are documented and communicated. <br />All incidents, near incidents, and unsafe situations reported. <br />rte epresentative Comments: <br />COMPANY CONFIDENTIAL <br />O Tanknology Inc., 2019. All Rights Reserved. <br />k1r'nted copies of this document are uncontrolled. The curtent version is available in the Tanknolo On -Line Document Control SiiiE <br />
The URL can be used to link to this page
Your browser does not support the video tag.