Laserfiche WebLink
OPVV 7150 overfill Materials ` � Important <br /> Prevention Valves ' lnolder loprevent product <br /> valve Body: Cast aluminum i spillage from the Underground <br /> certified OPW 7150 Storage7ank (UST), properly <br /> The CARB <br /> float Nitrile rubber, closed cell foam mainlalned delivery equipment <br /> vapor-tight Overfill Prevention Valve Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of tight•fill adaptor are essential. <br /> underground storage tanks by providing Seals : Viton° Delivery personnel should <br /> � . . be managed and trained <br /> a positive shut-Dff of product delivery, Upper & lower Drop Tube: Aluminum ^ • to Inspect deliveryeibows <br /> The shut-off valve is an Integral part of Plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . missing parts. They should <br /> Hardware: Stainless steel prp always make certain there <br /> The OPW 71SO allows easyinstallation ofkr Is a positive connection <br /> (lily t+ ?S� ' ' <br /> (without breaking concrete) and requires Features <br /> (lilt ' d : between the adaplaiand <br /> no special manholes. elbow, If delivery equipment <br /> � simple, Easy and Quick <:�J Is not properly maintained, <br /> The 0 P 71 SO is a vapor-tight two- Installation — no excavation or ;, or the elbow is not securely <br /> stage shut. off valve, When the liquid �� `• ' coupled pi the adaptor, a <br /> g q special manholes required. •,s;: serious spill may result when <br /> level rises to about 95% of tankEconomical — casts a fraction ;i? .,. the DPW7iSO doses, causing <br /> capacity, the valve mechanism is oiex expensive, complicated t ahaaardand environmental <br /> released, closing automatically with p v contamination, <br /> difficult-to•Install valves, - � <br /> the flow. This reduces the flow rate to Furnished Complete supplied NOTE: The DPW 71 SO is <br /> approximately 5 gpm through a bypass p — designed for use on tight•fll <br /> valve, The operator may then stop the with new upper and lower drop tubes, gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. '� ( fill applications, <br /> exceeds the 95 % level, the valve will � Completely Automatic operation <br /> close automatically each time delivery — no prechecks to perform, no resets Retrofits Directly — for both neva <br /> is attempted . and no overrides to be broken and existing tanks with A " fill risers, <br /> if the delivery is not stopped and the or abused , + Quick Drain Feature — <br /> liquid rises to about 981/0 of tank a No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level, pressure is relieved. <br /> completely, No additional liquid can flow 4• Will Accept a Dipstick + Best Flow Rate in The Industry' <br /> Into the tank until the level drops below for Gauging <br /> • oPW rest Lob results <br /> a reset point. <br /> NOTE: The 7150 overfill Prevention to to.* . <br /> Valve can be adjusted to shutoff at any advantages of overfill Prevention <br /> desired tank capacity. Please contact the Compared to overfill Warning Systems: <br /> Authority Having Jurisdiction (AH1) and ,tr Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to : [tperatian — does nat rely on the spill risk. <br /> determine the regulatory requirements alertness or speed of response of the Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of _ product flows unimpeded into <br /> region, as well as take into account overfill prevention , <br /> other considerations such as extreme p the tank until the hose kick that <br /> tank tilt, In ail cases, the upper tube Keeps the Top of UST "Dry," accompanies the valve shut-off <br /> ar signal that the <br /> must protrude into the tank at least el m natAing possible leaks at loose IqRequirements 0000 id has teethed the shut off level. <br /> 6112 to ensure that the valve can shut . <br /> off flow into the tank completely before bung fittings and the need fordouble containment on vent lines, ° Simple and inexpensive <br /> the top of the tank is wetted as per installation moss, p in both two oint <br /> EPA requirements, t Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required, <br /> Number: M15524PA <br /> �!f Loot: for this lapel lot <br /> Listings and � a' authentic DPWrvn <br /> �.r'= tf �[a tanPtas?e Approved products, <br /> certifications CenrntnbAa <br /> Rll(w t a•itd b� . OPW7lsoIsEVII Approved for Efs <br /> » ! r 4 n f <br /> ot 40` <br /> '3 '7Titl. <br /> y i "1 �t ''j tfzidhay�tti°r< <br /> uA <br /> tiv �^ + }vqr td, " <br /> � Fb � too <br /> ton cf <br /> t t <br /> ,t.! t iL ,';f . . S�.E...1•..Jl'A:°_ ' t ;p2 <br /> . xr» �,-q�....4 R. v.4.'...rv.a.4•T�1 :4- ..� ✓ . . , _ .:. i. :b. ... -IGu �a:flq .. <br />