Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMPIUDC TEST (continued) <br />Test Method Developed by J Manufacturer El Industry Standard EJ Professional Engineer <br />Test Type Ll Pressure L] Vacuum Ll Hydrostatic <br />Test Equipment Used: <br />SumplUDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />PassfFail Criteria <br />Tightness Test Results <br />Ll Pass Ll Fa4l <br />J Pass J Fail <br />L-1 Pass Ll Fail <br />D Pass U Fail <br />SumplUDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />PassfFail Criteria <br />Tightness Test Results <br />J Pass Ll Fail <br />J Pass LA Fail <br />L-1 Pass ® Fail <br />Ll Pass Ll Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness rest must be described in <br />the COMMENTS section. <br />Page 4 of 5 <br />