My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 6:03:07 PM
Creation date
7/18/2022 8:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
UNFI GROCERS DISTRIBUTION, INC (STOCKTON)
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# NW1-2353288 <br />Tanknology Inc. Policy 100-29-A <br />11000 N. Nfopac Expressway. Suite 500 Austin, Ta 75759 (SM) 964.0010 <br />JOB CLEARANCE FORM & SITE SAFETY CHECKLIST — OVF RevRevc <br />Rccisrd: 2/1 1/2019 <br />dd Namelr: <br />F — �y I ( <br />Street Addres <br />r,010�V_L e 11 0v 6k <br />W.O. N <br />mval!me: <br />GeGahu�e ' -- <br />ravel Time <br />hers m site: <br />oc) <br />i 2'� <br />Scope of Work and Tasks P rformed (JS ust be va''at'e loc a'! tads'. <br />A <br />tsk <br />Repairs to EqTipmeni or Parts Pro ed: <br />Follow-up actions required; equipment isolated: comments: <br />PPE - PERSONAL PROTECT E EQUIPMENT REQUIRED Teck ✓items used or mark -if nota livable <br />afety Vest <br />Safety Glasses <br />I ocGloves <br />Hearing Protection <br />Steel Toe Boots <br />Splash Goggles <br />Hard Hat <br />Other <br />,1 -,,-PRE-TEST PROCEDURES Check ✓each item completed or mark - if not applicable <br />1. e Discuss safety procedures with site personnel. Nearest hospital: <br />2. ❑ r to fuel deliveries the UST system must be placed back into working order. <br />3. re entire work area with barricades (cones, flags, and extension bars, caution tape, pennant flags, or other perimeter guard). <br />4. P Place fire extinguishers and "No Smoking" signs in the work area. <br />5. ❑ Confined Space Entry — If required complete separate CSE Checklist. If NO CSE REQUIRED check the following reason: <br />No CS's.-CS's not opened —No entry only visual -No entry - used tools '_work from prone position w/o risk of falling in <br />6. ❑ Implement LockoutlTagout per API 1646 (when accessing product piping during tasks) <br />Secure nozzles with "Out of Service" bags and nylon ties. _ Secure the circuit breaker(s) with lockout devices and tags. <br />Close ball valves or check valves on product piping. _ Disconnect electrical "bayonet" connector from the STP(s). <br />All applicable equipment disabled during testis). - V ' y LO is co plete by tryin to perate pumps. <br />SIGN IN Lead Tech an N e ad Technician Signature <br />General Safety Checks: <br />All site personnel have been informed. <br />Is a fuel delivery due today? Site Representative Name Site Representative Signature <br />LOTO procedures have been discussed. <br />Work areas barricaded to protect workers, staff & public. <br />✓ POST-TEST PROCEDURES (Check -each item completed or mark - if not applicable) <br />1. Remove all "Lockout/Tagout" devices and nozzle bags/ties. <br />2. Run all pumps and verify there are no leaks: Impact Valve Test Ports under dispensers <br />Leak Detector Threads on STP's Functional Elements & Relief Screws <br />3. lead wire seal on all test plugs & leak detectors that were serviced. <br />zlnhtall <br />Count LD threads: L1 L2 L3 L4 _ L5 L6 <br />4. eck following components operational: ATG probes, sensors, & caps <br />fall floats, dry breaks & caps fdfhodic protection operational <br />/. feantainment sumps are dry /Dispensers & POS operational <br />penser panels are replaced op tubes, flapper valves, fill adapters & caps <br />/eDi <br />ak detectors & vent tubes / anhole covers and sump lids <br />Monitoring system is operational / Shear valves are open <br />Siphon lines and manifold valves open Spill containers & drain valves <br />STP fittings and bayonet connectors Vents & Extractors (not capped, plugged or isolated) <br />5. Remove barricades. <br />SIGN OUT & Operator Verification of Work (OVF) ead Techni N e ead echnician ignaturo <br />General Safety Checks: <br />Work area has been left clean & safe. <br />Site staff aware of work status including any remaining isolation. Si Representative Name SiteRepresentauve ignawre <br />Changes to equipment are documented and communicated. <br />All incidents, near incidents, and unsafe situations reported. <br />Sae Representative Comments: <br />COMPANY CONFIDENTIAL D Tanknology Inc., 2019. All Rights Re-in,,l <br />ranted copies of this document are uncontrolled The current version is mailable in the Tanknology On Une Ool.ument Control Svsiew <br />
The URL can be used to link to this page
Your browser does not support the video tag.