Laserfiche WebLink
A NJ O A Q U l N Environmental Health Department <br /> COUNTY— V AMENDED <br /> 8/22/2022 <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> San Joaquin General Hospital 500 W Hospital Rd, French Camp August 19, 2022 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test dates for the monitoring <br /> certification, and spill container on the designated operator inspection reports. Incorrect test dates for the <br /> monitoring certification were observed on the 11/3/21, 12/1/21, 12/30/21. and 1/26/21 DO reports.The date noted <br /> was 10/28/2021. Incorrect test dates for spill container were observed on the 2/23/21. 3/23/21.4/20/21. 5/18/21, <br /> 6/15/21. 7,/13/21, and 8/11/21. The date noted was 10/28/21.The correct date for monitoring certification is <br /> 10/28/21, and spill container testing is 8/12/21. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> This is a repeat violation, Class II. <br /> 316 CCR 2636, 2643(c)(1), 2666(f) Failure to install a line leak detector. <br /> OBSERVATION: The pressurized piping on the diesel tank is not equipped with an automatic line leak detector. <br /> REGULATION GUIDANCE:Automatic line leak detectors are required to be equipped on underground pressurized <br /> piping systems that carry a hazardous substance. <br /> CORRECTIVE ACTION: Correct immediately by having a properly licensed,trained, and certified contractor install a <br /> leak detector(LG 113-x listed, if applicable)and obtain a permit within one business day from the EHD. If the leak <br /> detector can't be installed immediately,there is a possibility that the diesel UST system may be red tagged to <br /> prevent fuel inputs. <br /> This is a Class I violation. <br /> Overall Inspection Comments: <br /> An inspection report was provided to the facility operator on the day of inspection. The report was amended and <br /> replaces the initial report. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the amended inspection report. <br /> Amendment made: <br /> Removed violation 202. <br /> Added violation 122. <br /> Added the repeat violation designation to violations 122, 208, 316. <br /> FA0000086 PR0231614 SCO01 08/19/2022 <br /> EHD 23-01 Rev.12/06/2021 Page 5 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />