My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:36 AM
Creation date
7/28/2022 11:51:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SPEEDWAY) #68150
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N , <br /> Measure&record"A"and'7,"and then peform the following calculation: <br /> "A" 1 G` I " Drop tube seal surface to the bottom of the tank <br /> -(subtract) <br /> " upper drop tube flange to the edge of the upper tube adapter <br /> (subtract) <br /> 4.5" Reference offset <br /> (equals) <br /> I v4., " Fina 15hutoff volume height <br /> Locate the final shutoff volume <br /> height on the tank chart <br /> Use the tank chart provided by the tank provided by the tank <br /> manufacturer to record and calculate the following: manufacturer,and record the <br /> r, Final shutoff volume closest corresponding volume. <br /> gal <br /> (divide by)77 <br /> ] I ` t_°C gall Actual tank capacity <br /> X(muliply by) <br /> loo <br /> M <br /> =(equals) If the flnal shutoff volume <br /> CL 00 ,l percentage is 95%or less,the <br /> u tJ aC{ �5 % Final shutaff volume percentage <br /> installation conforms to FF5 and <br /> industry recommended practices. <br /> L <br /> gal Actual tank capacity <br /> The final Shutoff Volume Percentage may <br /> - <br /> (subtract) The <br /> greater than 95%as long as the ullage <br /> 20 gall Final shutaft volume volume remaining is greater than or <br /> _(equals) equal to 254 gallons,so that"...none of <br /> r_ the fittings located on the top of the tank <br /> 4L� gall Linage volume remaining are exposed to product due to <br /> overfilling,"according to EPA 40 CFR Part <br /> 280. The installation must also meet all <br /> applicable regulatory requirements,and <br /> must be acceptable to the Authority <br /> Having Jurisdiction(AHJ}, <br /> L� <br />
The URL can be used to link to this page
Your browser does not support the video tag.