My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2022 9:08:55 AM
Creation date
7/28/2022 4:49:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> Z Check this box if tank gauging is used only for inventory control. <br /> L Check this box if Na tank gauging equipment is installed. Yes No NA <br /> (Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and Li Ll Lj <br /> termination: and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup Ll L1 L) <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? LA LA LJ <br /> Was accuracy of system's water level readings tested? L2 LA LJ <br /> Were all probes reinstalled properly? Ll Ll Lj <br /> Were all items on the equipment manufacturer's maintenance checklist completed? I E) D <br /> Probe ID Probe Model Tanks )Monitored Pass Fail <br /> 2 Lj <br /> Lj LJ <br /> Ll 0 <br /> Lj Ll <br /> 0 L1 <br /> L <br /> 9. COMMENTS <br /> Describe all answers marked "No'or "Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.