Laserfiche WebLink
Proposal & Cost Estimate <br /> lotCGRS <br /> ENHANCED LEAK DETECTION <br /> CGRS Contact: Tahtia Pearce 916-616-2233 <br /> tpearce@cgrs.com <br /> Date: June 4,2021 Customer Name: Walton Engineering <br /> Facility: Charter Way 76 Address: PO Box 1025 <br /> Address: 1720 Fresno Ave. City,State,Zip: West Sacramento,CA 95691 <br /> City,State,Zip: Stockton,CA 95206 Contact: Rick Walton <br /> County: San Joaquin Telephone/Email: 916-372-1888/r.walton@waltonengineering.com <br /> Scope of Work <br /> Perform pre and final ELD testing services at the above referenced location. Material costs are not included for iota test s etups,however they will be installed <br /> by the fuel system installation contractor prior to CGRS arrival for pretesting.In addition,this estimate is based on our u nderstanding of the fueling system, <br /> which is as follows: <br /> 1.Tanks -(1)20k and(1)12k/8k split double wall UST's-Brine filled <br /> 2.Sumps-(6)containing upper tank fittings and components <br /> 3.Under Dispenser Containment(UDC)-(6) <br /> 4.Vent and other Transition Sumps-(1) <br /> 5.Piping-(3)Product line(s)(DW FRP),(3)vent line(s)(DW FRP)and(1)vapor rec line(DW FRP) <br /> Costs for all testing work is based on our current fee schedule. Costs for the final ELD/iotaVisionT testing assume that al I site work can be completed within 8 <br /> hours on site. If the work takes longer than the specified time due to no fault of CGRS,additional hourly fees will be incu rred on a time and materials basis in <br /> accordance with our current fee schedule. <br /> Helium Pre-Testing (Accept O /Decline O) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 Test Primary System 1 flat rate $ 2,250.00 $ 2,250.00 <br /> 2 Helium 1 bottles $ 298.88 $ 298.88 <br /> 3 Mobilization&Perdiem 1 flat rate $ 750.00 $ 750.00 <br /> 4 Additional beyond 1 day Per diem(per man) 0 days $ 185.00 $ - <br /> 5 Additional hours beyond 8 hour day(per man) 0 hours $ 275.00 $ - <br /> Subtotal $ 3,298.88 <br /> Optional Pre-Testing on Secondary Pipe (Accept O /Decline O) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 Test Secondary Pipe 1 day $ 600.00 $ 600.00 <br /> Subtotal $ 600.00 <br /> Final Enhanced Leak Detection(ELD)Testing (Accept O /Decline O) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 System Testing(Final ELD) 1 flat rate $ 5,948.88 $ 5,948.88 <br /> 2 Project Permitting&Admin Fee 1 flat rate $ 300.00 $ 300.00 <br /> 3 Mobilization&Perdiem 1 flat rate $ 750.00 $ 750.00 <br /> 4 Additional beyond 1 day Per diem(per man) 0 days $ 185.00 $ - <br /> 5 Additional hours beyond 8 hours(per man) 0 hours $ 275.00 $ - <br /> Subtotal $ 6,998.88 <br /> The Standard Terms and Conditions attached are incorporated by reference and form part of this Agreement. By signing this Ag reement,you accept the <br /> proposal and acknowledge that you have read,understand and agree to the Standard Terms and Conditions set forth in this Agre ement. <br /> Accepted by Date <br /> Printed Name Title <br />