Laserfiche WebLink
MATERIAL AND WORKMANSHIP AND DELAYS(I.E.PUMPS,TARPS,ETC.). 6. INSTALL"TYPAR"FILTER FABRIC LINER IN TANK HOLE AND TRENCHES,WHERE 3. DISPENSERS SHALL BE ACTIVATED ONLY IN PRESENCE OF AN AUTHORIZED <br /> REQUIRED BY WET-HOLE OR UNSTABLE SOIL CONDITIONS. INSTALL TANK DISPENSER REPRESENTATIVE. CONTRACTOR HAS SOLE RESPONSIBILITY FOR <br /> I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS,ALL 15. UPON COMPLETION OF PROJECT,CONTRACTOR SHALL PROVIDE OWNER WITH HOLD-DOWNS IF STATED AS INCLUDED BY THE DRAWINGS. DAMAGE TO DISPENSERS)IF THIS INSTRUCTION IS NOT FOLLOWED. U pi <br /> EQUIPMENT,MATERIAL,AND ARTICLES INCORPORATED IN THE WORK COVERED BY "AS-BUILT"DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS GUILTS"SHALL BE �q <br /> THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE GRADE FOR THE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON APPROVED JOB 1. THE OWNER'S CONSTRUCTION MANAGER SHALL WITNESS PRE-INSTALLATION TANK 4. CONFIRM DISPENSER OPERATIONS(STP ISOLATION,BRAND PANELS,DECALS AND <br /> PROCESS INTENDED. COPY. TESTING. CONTRACTOR SHALL NOTIFY THE OWNER'S CONSTRUCTION MANAGER TWO NOZZLES MATCH,ETC.). IF MISCONNECTIONS OR OTHER PROBLEMS ARE DETECTED <br /> WORKING DAYS PRIOR TO TESTING AND TANK INSTALLATION. DURING CONFIRMATION OF DISPENSER OPERATIONS MAKE CORRECTIONS AND <br /> 2. CONTRACTOR SHALL NOT DEVIATE FROM MATERIALS OR PRODUCTS SPECIFIED 16. CONTRACTOR TO WARRANTY ALL WORKMANSHIP AND CONTRACTOR SUPPLIED REPEAT DISPENSER CHECK-OUT PROCEDURE. O COQ <br /> UNLESS THROUGH MUTUAL AGREEMENT WITH THE OWNER'S CONSTRICTION MANAGER MATERIAL FOR I YEAR THE OWNER SHALL PERFORM A 10 MONTH WARRANTY 8. TANK MANUFACTURER'S INSTALLATION PROCEDURE SHALL BE FOLLOWED,AND THE W 0 O <br /> APPROVAL MUST BE IN WRITING,SIGNED BY OWNER'S CONSTRUCTION MANAGER INSPECTION TO EVALUATE CONTRACTOR PERFORMIANCE AND QUALITY OF INSTALLATION CHECKLIST SHALL BE INITIALED/SIGNED BY CONTRACTOR AND THE 5. CALIBRATE AND SEAL METERS PER LOCAL REGULATIONS. ANY RE-CALIBRATION <br /> SUBSTITUTE MATERIALS SHALL BE DESCRIBED,SPECIFYING ANY DIFFERENCE IN WOPoJ'IANSHIP. CONTRACTOR MUST COMPLETE ALL PUNCH LIST ITEMS IDENTIFIED OWNER'S CONSTRICTION MANAGER,AS APPROPRIATE,AS EACH STEP IS REQUIRED TO OBTAIN APPROVAL FROM LOCAL REGULATORS SHALL BE X Z cvr <br /> COST AND PERFORMANCE. ONLY NEW MATERIALS SHALL BE USED. CONTRACTOR DURING THIS 10 MONTH INSPECTION. COMPLETED. CONTRACTOR'S RESPONSIBILITY. Z O m m <br /> SHALL BE CERTIFIED FOR THE INSTALLATION OF ALL EQUIPMENT AND MATERIALS ZO (Q 4 m <br /> CONTAINED IN THIS PROJECT AND THEIR REQ'D.ANCILLARY COMPONENTS. 11. CONTRACTOR SHALL PROVIDE A LIST OF SUB-CONTRACTORS,IF ANY,WHO WILL BE 9. AN UNDERGROUND EQUIPMENT INSTALLATION AFFIDAVIT SHALL BE FILLED OUT BY 6. CONTRACTOR TO FURNISH AND INSTALL NEW DISPENSER FILTERS AFTER <br /> USED ON THE PROJECT,IF REQUIRED. CONTRACTOR AND SUBMITTED TO THE OUNER'S CONSTRICTION MANAGER IN COMPLETING ALL LIQUID TESTING AND PRODUCT LINE PURGING. ACTIVATE EACH -H 00 <br /> 3. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S REPRESENTATIVE FOR HIS BOUND PROJECT CLOSE OUT FOLDER PRODUCT ON EACH DISPENSER AND INSPECT FILTER FOR LEAKS.RECHECK <br /> uj <br /> APPROVAL THE NAME OF THE MANUFACTURER,THE MODEL NUMBER AND OTHER 18. CONTRACTOR IS TO SCHEDULE ALL SUBCONTRACTORS,INCLUDING THOSE PRIMARY LINE CONNECTIONS AT DISPENSER BASE AND STP FOR LEAKS. N <br /> IDENTIFYING DATA AND INFOR-IATION RESPECTING THE PER=OR-IANCE, CONTRACTED DIRECTLY WITH THE OWNER'S CONSTRICTION MANAGER THE OWNER 10. CONTRACTOR TO PROVIDE REQUIRED TEST MANIFOLDS PER MANUFACTURER'S <br /> CAPABILITY,NATURE,AND RATING OF THE MACHINERY,MECHANICAL AND OTHER WILL PROVIDE A LIST OF SUBCONTRACTORS,CONTACTS AND PHONE NUMBERS, INSTRUCTIONS AND SPECIFICATIONS. PRESSURE GAUGES SHALL BE IN GOOD 1. CONTRACTOR SHALL PERFORM START-UP IF APPROVED BY THE DISPENSER/POS d) <br /> EQUIPMENT,MATERIAL OR ARTICLES WHICH THE CONTRACTOR CONTEMPLATES FOR THOSE SUBCONTRACTORS THAT HAVE CONTRACTS DIRECTLY WITH THE REPAIR AND HAVE A CALIBRATION DATE WITHIN 30 DAYS OF USE.PRESSURE MANUFACTURER IF CONTRACTOR 15 NOT APPROVED BY THE DISPENSER/POS W <br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S REPRESENTATIVE. OWNER. GAUGES DAMAGED OR OUT OF CALIBRATION WILL NOT BE PERMITTED. MANUFACTURER,THEN AN AUTHORIZED CONTRACTOR SHALL BE SUBCONTRACTED <br /> TO PERFORM <br /> START-UP. CONTRACTOR SHALL ALSO PROVIDE AN AUTHORIZED <br /> 4. MACHINERY,EQUIPMENT,MATERIAL,AND ARTICLES INSTALLED OR USED WITHOUT IS. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND 11. THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND SERVICE TECHNICIAN TO PROVIDE UP TO 8 HOURS OF ON-SITE TRAINING FOR <br /> REQUIRED WRITTEN APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT OBTAIN,AT THE COMPLETION OF THE PROJECT,ALL CERTIFICATES REQUIRED TO INSTALLATION OF THE UNDERGROUND STORAGE TANKS AND SHALL ENSURE THAT STORE PERSONNEL. CONTRACTOR 18 RESPONSIBLE FOR START-UP AND <br /> REJECTION. RUN THE FACILITY. GOOD WORKMANSHIP PRACTICES AND CONSTRUCTION PROCEDURES ARE CALIBRATION OF FUELING SYSTEMS. COSTS MUST BE INCLUDED IN CONTRACTOR'S <br /> FOLLOWED REGARDLE55 OF THE INCLUSION OR OMISSIONS OF ANY APPLICABLE BASE BID. <br /> 5. CONTRACTOR TO PROVIDE ALL MATERIALS NOT LISTED ON THE OWNER'S 20. CONTRACTOR SHALL PLACE THE HIGHEST PRIORITY ON SAFETY AND HEALTH SUGGESTIONS IN THESE INSTRUCTIONS. <br /> SUPPLIED EQUIPMENT LIST,INCLUDING ELECTRICAL COMPONENTS,REQUIRED FOR DURING THE PROGRESS OF WORK PER=OWED AT THE OILNER'S STORE B. CONTRACTOR SHALL PROVIDE AND INSTALL PUMP NUMBERS,OCTANE DECALS,NO <br /> A COMPLETE,WORKABLE E OPERATING FUEL STORAGE AND DISPENSING SYSTEM. LOCATIONS.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE 12. UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THESE AND THE SMOKING DECALS AND EMERGENCY SHUT-OFF SIGNS,PER THE OWNER'S IMAGE LU S 'V <br /> AND MAINTAIN A SAFE WORKING ENVIRONMENT FOR ITS EMPLOYEES DURING THE MANUFACTURER'S INSTRUCTIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR GUIDELINES AND ALL APPLICABLE CODES AND REGULATIONS.CONTRACTOR Z 4)W �0 <br /> 6. CONTRACTOR 15 RESPONSIBLE FOR COORDINATING,RECEIVING AND UNLOADING PROGRESS OF WORK AND TO PROTECT THE HEALTH AND SAFETY OF MANUFACTURER'S SPECIALISTS ARE AVAILABLE FOR CONSULTATION.THE SHALL INSTALL ALL OWNER PROVIDED DECALS,PUMP TOPPERS AND WINDSHIELD 111 6'O X <br /> THE ENTIRE OWNER'S SUPPLIED EQUIPMENT DELIVERED TO CONTRACTOR'S CONTRACTOR'S AGENTS,SUBCONTRACTORS,THE PUBLIC AND ANY THIRD PARTIES. PRESENCE OF THE OWNER'S CONSTRUCTION MANAGER OR THE MANUFACTURER'S CADDIES/TRASH CANS PRIOR TO FINAL PROJECT ACCEPTANCE. Q U O- 4 <br /> Q U <br /> WAREHOUSE,OR JOB SITE.THE SECURING OF EQUIPMENT REMAINS THE ALL TOOLS,MATERIALS,EQUIPMENT,FACILITIES AND OTHER ITEMS USED BY THE OBSERVER AT ANY INSTALLATION SITE DOES NOT RELIEVE THE CONTRACTOR OF _ w <br /> CONTRACTOR'S RESPONSIBILITY UNTIL THE PROJECT RETAINAGE IS PAID. CONTRACTOR AND PRACTICES EMPLOYED BY THE CONTRACTOR IN HIS RESPONSIBILITY FOR THE PROPER INSTALLATION OF THE TANKS OR OTHER B. CONTRACTOR TO FURNISH AND INSTALL FIRE EXTINGUISHERS AND APPROPRIATE W J W X X O>i11 q Q <br /> CONTRACTOR TO DISTRIBUTE ALL RECEIVING DOCUMENTS TO THE OWNER'S ACCOMPLISHING THE WORK ARE CONSIDERED TO BE PART OF THE WORKING EQUIPMENT. DECALS PER APPLICABLE REGULATIONS. � <br /> _00 W U <br /> CONSTRUCTION MANAGER ENVIRONMENT. 13. TANKS SHALL BE PLACED ACCORDING TO THE TANK MANUFACTURER'S TESTING W Z in r W <br /> 1 TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND 21. CHEMICAL COMP UNDS REGULATED O KEEP ON SITE EHROUGHRIAL SAFETY <br /> USE.P.A.THATSHEETS <br /> WILL BE USED FOR INSTALLAHE SOIL TS UNSTABLE,AND <br /> THE STANDARDS MAY BE IINNCREASED.PLEASE <br /> D18TAN E BETWEEN I. OWNER'S REPRESENTATIVE SHALL WITNESS ALL TESTING AT HIS/HER DISCRETION. N<,- <br /> REGULATIONS. H <br /> ON-SITE OR HAS THE POTENTIAL FOR HUMAN CONTACT CIE,GASOLINE,DRY ICE, TANKS SHALL BE GOVERNED BY MANUFACTURER'S OR STATE AND LOCAL CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE AT LEAST TWO DAYS <br /> e. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS AND SOLVENTS,GLUES,ETC.) REQUIREMENTS,WHICHEVER I5 GREATER PRIOR TO ANY TESTING,IN WRITING. Q @ Q �U <br /> THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE d) P <br /> OWNER'S REPRESENTATIVE. 22. WHILE ON SITE AND DURING WORKING HOURS,CONTRACTOR'S PERSONNEL MUST 14. TANKS ARE TO BE SET LEVEL AND BACKFILLED TO TOP OF TANK THE SAME DAY 2. ALL TESTING SHALL COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND <br /> WEAR SHIRTS,LONG PANTS,HARD HATS WHEN REQUIRED,AND ACCEPTABLE FOOT AS TESTING. REQUIREMENTS,TRADE STANDARDS AND GOVERNING RULES AND CODES, <br /> 9. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR LOCAL WEAR PER OSHA,REGULATIONS. INCLUDING THE USE OF CERTIFIED AND APPROVED INDEPENDENT THIRD PARTY 0 0 <br /> REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS PROJECT,IT 15 15. INSTALL TANK TRIM a EQUIPMENT PER DRAWINGS AND CURRENT MANUFACTURER'S TESTERS,WHEN REQUIRED. E Z <br /> EXPECTED THAT THE MOST RESTRICTIVE CONDITIONS)WOULD APPLY. 23. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK AND INSTRUCTIONS,WHICH SHALL BE FOLLOWED AT ALL TIMES,AND SHALL HAVE W <br /> EQUIPMENT INSTALLATION PRIOR TO THE START OF WORK. CONTRACTOR WILL PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SHALL 3. FINAL TESTING SHALL BE CONDUCTED BY A THIRD PARTY TESTING COMPANY U <br /> GENERAL CONDITIONS CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH ITS EMPLOYEES AND THE BE COMPLETED BY THE FUEL SYSTEM CONTRACTOR AS EACH STEP IS COMPLETED. SUBCONTRACTED TO THE FUEL SYSTEM CONTRACTOR. TESTING METHODS MUST BE <br /> MEETING MINUTES WILL BE SUPPLIED TO OWNER TESTING SHALL CONFORM TO MANUFACTURER'S REQUIREMENTS. OWNER'S APPROVED BY THE OWNER'S CONSTRUCTION MANAGEMENT AND CONFORM TO ALL <br /> 1. CONTRACTOR EMPLOYEES SHALL HAVE COMPLETED 40 HOURS OCCUPATIONAL REPRESENTATIVE SHALL WITNESS ALL TANK TESTING AT HIS/HER DISCRETION. REGULATIONS AND CODES. FUEL SYSTEM CONTRACTOR SHALL SCHEDULE AND <br /> SAFETY E HEALTH ADMINISTRATION(OSHA)TRAINING COURSE PRIOR TO THE 24. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE DURATION COORDINATE THE TESTING CONTRACTOR ALONG WITH ANY LOCAL INSPECTIONS <br /> START OF WORK. CERTIFICATION OF THIS MUST BE PROVIDED TO THE OWNER'S OF THE CONTRACT A SITE HEALTH e SAFETY PLAN(SAFETY PLAN)THAT WILL 16. FUEL SYSTEM CONTRACTOR TO INSTALL NEW ELECTRICAL SYSTEMS PER PLANS a REQUIRED TO OPEN THE SITE/STORE. FUEL SYSTEM CONTRACTOR SHALL HAVE A <br /> REPRESENTATIVE PRIOR TO THE START OF WORK EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS,AND= MANUFACTURERS'REQUIREMENTS. ARRANGE FOR ALL INSPECTIONS. PROVIDE ALL REPRESENTATIVE ON-SITE DURING ALL TESTING. <br /> CONDUITS,CONDUCTORS,J-BOXES,SEAL-OFFS,ETC.REQUIRED FOR FUEL SYSTEM'S Q <br /> 2. FUEL SYSTEM CONTRACTORS AND EMPLOYEE INSTALLERS SHALL HAVE ALL A: APPOINT AN EMPLOYEE AS THE SAFETY OFFICER WHO IS QUALIFIED AND ELECTRICAL SYSTEMS. THE FUEL SYSTEM'S ELECTRICAL SYSTEMS INCLUDE,BUT 4. ANY COSTS ASSOCIATED WITH FAILED TESTS AND SUBSEQUENT REPAIRS/ n <br /> CURRENTLY REQUIRED EQUIPMENT MANUFACTURERS'CERTIFICATIONS e APPROVALS AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE SAFETY PLAN. AR=NOT LIMITED TO,HIGH 6 LOW VOLTAGE POWER,MONITORING 6 COMMUNICATIONS RE-TESTS WILL BE THE CONTRACTOR'S RESPONSIBILITY.CONTRACTOR MUST USE W <br /> FOR INSTALLATION OF:ALL OF THE FUEL SYSTEM RELATED WORK,INCLUDING FUEL SUBMIT THE NAME AND QUALIFICATIONS OF THE SAFETY OFFICER TO THE OWNER'S (INTERCOM E CONTROL)REQUIREMENTS. AND PAY THE OWNER'S TESTING COMPANY FOR ANY RE-TESTS. <br /> SYSTEM ELECTRICAL COMPONENTS,(INCLUDING,BUT NOT LIMITED TO TANKS,PIPING, REPRESENTATIVE PRIOR TO COMMENCING WORK ON THE SITE. Q -I Q <br /> SUMPS,DISPENSERS,MONITORING,COMMUNICATIONS AND ELECTRICAL)AND SHALL 11. INSTALL EQUIPMENT AS LISTED IN OWNER'S EQUIPMENT LIST AND PROVIDE AND 5. CONTRACTOR MUST OBTAIN A COPY OF ALL TEST REPORTS FROM TESTING _J - n mLU <br /> PROVIDE A COMPLETE,WORKABLE FUEL SYSTEM PER MANUFACTURERS'a CODES' B: THE SAFETY PLAN SHALL CONTAIN THE NAMES,ADDRESSES AND TELEPHONE INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE AND COMPANY TO BE SUBMITTED WITH THE PROJECT CLOSE-OUT REQUIREMENTS. - <br /> REQUIREMENTS,AND IN ACCORDANCE WITH,BUT NOT LIMITED TO,CALIFORNIA NUMBERS OF THE SUPERVISORY PERSONNEL,THE HOSPITAL FACILITIES NEAREST WORKABLE FUELING SYSTEM. <br /> UNDERGROUND STORAGE TANK(UST)REGULATIONS a CALIFORNIA AIR RESOURCES THE SITE,AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE WRITTEN IN THE 6. FULLY TEST ALL SYSTEMS,AND REPAIR AS NECESSARY. SECURE ALL REQUIRED <br /> BOARD(GARB)REQUIREMENTS. CERTIFICATES SHALL BE PROVIDED TO OWNER SAFETY PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS OR 18. PROVIDE AND INSTALL NEW PRODUCT,VENT,VAPOR,AND SECONDARY TESTS,INSPECTIONS,AND APPROVALS OF THE COMPLETED SYSTEM. MAKE ALL W F <br /> CONTRACTOR SHALL COMPLETE THE INSTALLATION CHECKLISTS SUPPLIED BY HAZARDOUS SUBSTANCES BE UNCOVERED. CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S INSTRUCTIONS REQUIRED ADJUSTMENTS AND CORRECTIONS. DO NOT BACKFILL TRENCHES OR Q Y ~ m LU O <br /> MANUFACTURERS AND SHALL FURNISH THE CHECKLISTS TO OWNER. SHALL BE FOLLOWED AT ALL TIMES,AND SHALL HAVE PRECEDENCE OVER OTHER TANK TOP UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. Q U O <br /> C: IF,DURING THE COURSE OF THE WORK,UNSAFE CONDITIONS DEVELOP OR ARE INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SHALL BE COMPLETED BY THE <br /> 3. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: ENCOUNTERED,TAKE IMMEDIATE MEASURES TO CORRECT THE CONDITION. IF THE FUEL SYSTEM CONTRACTOR,AS EACH STEP 18 COMPLETED. 1. CONTRACTOR SHALL PROVIDE ENHANCED(EL.D.)LEAK DETECTION TEST ON <br /> CORRECTIVE ACTION IS INSUFFICIENT IN THE OPINION OF THE OWNER'S SYSTEM AFTER PAVING 1.5 COMPLETE AND PRIOR TO FINAL PROJECT <br /> A. GENERAL ENGINEERING(A) REPRESENTATIVE,CONSTRUCTION WORK SHALL CEASE UNTIL CORRECTIVE ACTION A: FIBERGLASS REINFORCED PLASTIC IF.RP.)PIPING: PRIMARY PIPING WITH ACCEPTANCE. TEST SHALL BE CONDUCTED BY A CERTIFIED TESTER- <br /> 5: <br /> ESTERB: HAZARDOUS MATERIAL SUBSTANCE HANDLING(HAZ) CAN BE IMPLEMENTED. CONTAINMENT SYSTEM SHALL BE RED THREAD IIA AND RED THREAD 11 WITH CONTRACTOR SHALL PROVIDE WRITTEN REPORT OF E.L.D.TEST TO OWNER'S W <br /> FITTINGS AND DS-1000 AND DS-8000 SERIES ADHESIVE. REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF PROJECT. - <br /> 4. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL D: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHERS WITH A MINIMUM CLASS . DO NOT MIX Z W W }S <br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER AS RATING OF 2-A20-5:G WITHIN 50 FEET OF THE OPERATION. DIFFERENT MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT SYSTEMS 8. PROVIDE A STATIC PRESSURE PEWOR'IANGE TEST,ACCORDING TO THE GARB >01-- . <br /> "ADDITIONAL INSURED". SHALL BE UL APPROVED FOR 100%METHANOL. CONTAINMENT SYSTEM SHALL BE PROCEDURE TP-201,IN ACCORDANCE WITH APPROPRIATE EXECUTIVE ORDER 00 Q-Z„. <br /> 25. UNDERGROUND SERVICE ALERT(U.S.A.) D <br /> .A.)-THE CONTRACTOR SHALL NOTIFY BY THE SAME MANUFACTURER,WITH THE SAME SERIES ADHESIVES AND/OR (EO)VR-204-x( ,OR AS REQUIRED BY LOCAL REGULATIONS. <br /> A: STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY MEMBERS OF U.S.A.AT LEAST 2 FULL WORKING DAYS(BUT NOT MORE THAN 14 DAYS) FITTINGS. W W O.4 0 <br /> B: COMPREHENSIVE GENERAL LIABILITY,WITH A COMBINED SINGLE LIMIT OF NOT 10NEDGAL,L PROGRAM CE OF ONUMBER ING AB-I-I1 ORNY A(800)ZZWORKOBY CALLING THE TOLL-FREE B: VENT/VAPOR PIPING: SAME AS F.RP.PIPING,A. 9 RETOUVRN PROVIDE <br /> OORDING O GARB PROCDOCUMENTATION OF A DYNAMICEDURE TP-201,ACK R �IN ACCORDANCETEST OF ALL WITHa Y �U <br /> LE 6 THAN <br /> $1,000,000 PER OCCURRENCE FOR BODILY INJURY AND PROPERTY EXCAVATION C: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE 40,OR APPROPRIATE EO VR-204-x(D,OR AS REQUIRED BY LOCAL REGULATIONS. N Z (y Z Q <br /> EXTRA STRONG. GALVANIZED PIPE IS NOT ALLOWED. FITTINGS SHALL BE 300 1-51 10. PROVIDE LIQUID REMOVAL TEST USING EO VR-204-x(Z). N V G_L 0 <br /> C: F-v AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED OR HIRED VEHICLES I. ALL EXCAVATIONS SHALL BE PERFOR'IED IN COMPLIANCE WITH OSHA AND STATE MALLEABLE IRON. <br /> WITH A COMBINED SINGLE LIMIT OF LIABILITY OF NOT LESS THAN$1000,000 PER REGULATIONS. THE CONTRACTOR IS REFERRED TO THE OSHA BOOKLET, 11. PROVIDE STATIC TORQUE TEST OF ROTATABLE PHASE I ADAPTERS ACCORDING <br /> OCCURRENCE FOR BODILY INJURY AND PROPERTY DAMAGE. "EXCAVATING AND TRENCHING OPERATIONS",FOR A SAFE WORK PRACTICES GUIDE D: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT WHICH TO CARE PROCEDURE TP-201,IN ACCORDANCE WITH APPLICABLE EO. Q N Q Z <br /> FOR PERFORMING EXCAVATION WORK. SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL COMPATIBILITY U)N 4 <br /> 5. CONTRACTOR TO FURNISH ALL LABOR,MATERIAL,EQUIPMENT,AND SERVICES WITH THE PIPING MATERIAL USED,AND FOR USE WITH FUEL SYSTEM SOLVENTS, 12. PROVIDE LEAK RATE TEST OF OVERFILL PREVENTION DEVICE ACCORDING TO <br /> NECESSARY FOR OR REASONABLY INCIDENTAL TO THE SATISFACTORY 2. EXCAVATION SHALL BE SIZED PER TANK MANUFACTURER'S GUIDELINES.PIPELINE FUELS,OILS,DIESEL,AND 1009,METHANOL,WHICH SHALL BE VERIFIED BY CARIB PROCEDURE TP-201 <br /> COMPLETION OF ALL WORK SHOWN ON,GALLED FOR,OR REQUIRED BY THE TRENCHING SHALL BE PER PIPELINE MANUFACTURER'S GUIDELINES CURRENT MANUFACTURER'S PRODUCT DATA SHEET. <br /> DRAWINGS,EXCEPT AS NOTED AS SUPPLIED BY OWNER OR OTHERS. 13. PROVIDE LEAK RATE TEST OF PRESBURENACUUM VENT VALVES ACCORDING TO <br /> 3. THE OWNER RESERVES THE RIGHT TO DESIGN AND/OR CONSTRUCT SHORING UNDER E: ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH 20 MIL.PVC GARB PROCEDURE TP-201. <br /> 6. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CALIF.BUILDING AN AMENDED AGREEMENT WITH CONTRACTOR OR SEPARATELY WITH ANOTHER PIPE WRAP,OVER A PIPE WRAP PRIMER FOR USE WITH VINYL TAPES,AND SHALL <br /> CODE,CALIFORNIA FIRE CODE,CALIFORNIA ELECTRICAL CODE,CALIFORNIA COMPANY.IF THE OWNER ENGAGES CONTRACTOR,CONTRACTOR SHALL SUBMIT BE BY THE SAME MANUFACTURER AS THE WRAP. 14. PROVIDE ALL OTHER TESTING,CERTIFICATIONS AND DOCUMENTATION AS <br /> UNDERGROUND STORAGE TANK REGULATIONS,OSHA CONSTRICTION SAFETY SHORING DESIGN TO THE OWNER'S CONSTRUCTION MANAGER FOR APPROVAL. REQUIRED BY STATE AND LOCAL REGULATIONS,MANUFACTURER REQUIREMENTS, <br /> ORDERS,NATIONAL FIRE PROTECTION ASSOC.(NFPA),UNDERWRITER'S SUPPLEMENTAL JOB SCOPE AND COST SHALL BE AGREED TO IN TERMS OF A F: CONTRACTOR SHALL DEMONSTRATE TO OILNER'S REPRESENTATIVE THAT ALL AUTHORITIES TO CONSTRUCT,CARE EXECUTIVE ORDERS AND APPROVAL LETTERS, <br /> LABORATORIES,INC.CUL),CARE EXECUTIVE ORDERS AND GUIDANCE LETTERS CONTRACT CHANGE ORDER PRIOR TO COMMENCING WORK SHORING SHALL BE MATERIALS ARE NEW AND CONFORM TO ABOVE SPECS,IF REQUIRED. INCLUDING REQUIREMENTS OF VERIFICATION AND REVERIFICATION TESTING AFTER <br /> AND ANY OTHER APPLICABLE STANDARD OR STATE REGULATION,COUNTY OR REMOVED PRIOR TO INSTALLING PRODUCT PIPING UNLESS APPROVED BY THE SYSTEM OPERATION BEGINS AND AFTER STATUTORY OPERATIONAL INTERVALS <br /> CITY ORDINANCES. OWNER'S CONSTRUCTION MANAGER TO ABANDON IN PLACE. 19. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER TANKS REQUIRED AS PART OF THE INSTALLATION REQUIREMENTS OF THE FUELING SYSTEM, <br /> SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS REQUIRED BY INCLUDING(BUT NOT LIMITED TO): PRECISION TANK /LINE,SB SBS,AIR QUALITY <br /> 1. ALL FUEL SYSTEM PEWITS TO BE SECURED BY THE CONTRACTOR,WHO 15 4. UNSTABLE SOILS MAY BE REQUIRED TO HAVE A FILTER FABRIC EXCAVATION MANUFACTURER MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING IS NOT (PER EXECUTIVE ORDERS FOR SYSTEM INSTALLED)AND A FULL MONITORING LU <br /> RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. CONTRACTOR LINER CONSULT BID DOCUMENTS OR THE OWNER'S CONSTRUCTION MANAGER FOR SHOWN ON SITE PLAN,CONTRACTOR SHALL RUN LINES THE MOST DIRECT ROUTE CERTIFICATION(INCLUDING LEAK DETECTOR AND SPILL CONTAINER TESTING). <br /> SHALL SECURE MISCELLANEOUS ELECTRICAL PERMIT UNLESS WORK 15 COVERED SPECIFIC INFORMATION REGARDING THIS ISSUE. SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. <br /> BY OTHER BUILDING PERMITS FOR THE PROJECT. 15. ALL TESTING SHALL BE CONDUCTED IN THE PRESENCE OF LOCAL CUPA/FIRE <br /> 5. MINIMIZE SURFACE WATER ENTERING EXCAVATIONS BY CONSTRICTING DIVERSION 20. PROVIDE AND INSTALL ALL CONDUIT,CONDUCTORS,J-BOXES,SEAL-OFFS,ETC.,FOR DEPT.REPRESENTATIVE,AND INSPECTIONS SHALL BE COORDINATED THROUGH LLI <br /> 8. CONTRACTOR SHALL VISIT SITE AND FAMILIARIZE HIMSELF OF ALL EXISTING DAMS AROUND TANKFIELD EXCAVATION AND PIPING TRENCHES. FUEL SYSTEM(S)AS INDICATED OR REQ'D.FOR A COMPLETE,WORKABLE SYSTEM. THE PHONE IN OR ON-LINE SYSTEMS IN ADVANCE OF INSPECTION REQUESTS. ~ <br /> CONDITIONS PRIOR TO START OF CONSTRICTION. Q <br /> 6. A CONTINGENCY PLAN SHALL BE DEVELOPED WITH THE OWNER'S CONSTRUCTION 21. ALL CONDUIT IS TO BE 3/4"(MINIMUM). <br /> 9. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO REMAIN UNLESS MANAGER OUTLINING EMERGENCY PROCEDURES FOR OBTAINING THE NECESSARY CONTRACTOR ON THIS SHEET MEANS THE FUEL SYSTEM CONTRACTOR. <br /> NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR REPLACE TO THE EQUIPMENT AND/OR PERSONNEL TO HANDLE UNEXPECTED WATER ENTRY INTO THE 22. INSTALL NEW MONITORING COMPONENTS PER DRAWINGS AND EQUIPMENT LIST,AND <br /> SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY EXISTING FACILITIES THAT TANK FIELD EXCAVATION OR PIPING TRENCHES.WHEN WATER MAY CONTAIN SUPPLY a INSTALL ADDITIONAL COMPONENTS AS REQUIRED FOR A COMPLETE AND GENERAL CONTRACTOR(G.C.)ON THIS SHEET MEANS THE OWNER'S G.C.FOR THE rFo <br /> ARE DAMAGED BY THE CONTRACTOR'S OPERATIONS. HYDROCARBONS,CONSULT THE OWNER'S CONSTRUCTION MANAGER PRIOR TO WORKABLE SYSTEM. SITE/PROJECT,IF IT IS OTHER THAN THE FUEL SYSTEM CONTRACTOR S <br /> REMOVING IT FROM SITE. c � jwd <br /> 10. CONTRACTOR SHALL KEEP THE 517E FREE OF WA57E AND RUBBISH AT ALL TIMES. 23. INSTALL DISPENSERS AND MISCELLANEOUS FUELING SYSTEMS,AS INDICATED ON L W <br /> CONTRACTOR SHALL HAVE THE WORK AREA PROFESSIONALLY CLEANED THE DAY FUEL SYSTEM WORK SCOPE PLANS AND DESCRIBED IN THE OWNER'S EQUIPMENT LIST. W y <br /> BEFORE THE OWNER'S FINAL PROJECT INSPECTION. CONCRETE Z 0 `_w w <br /> I. PRIOR i0 THE START OF WORK,PROVIDE OWNER WITH WORK PLAN AND SCHEDULE 24. SUPPLa INSTALL NEW CONCTE TANK AND DRIVE SLABS AND OTHER FUELING gy <br /> 11. WHEN AN INSTALLATION IS MADE AT AN EXISTING STORE,THE CONTRACTOR IS TO THAT COORDINATES SCHEDULING WITH OTHER PORTIONS OF THE PROJECT TO THE SYSTEM CONCRETE AS INDICATED ON FUEL SYS.SITE PLAN. CONCRETE SHALL 00 $m � Q <br /> SCHEDULE AND PERFORM HIS WORK 50 AS NOT TO INTERFERE WITH THE NORMAL FULLEST EXTENT POSSIBLE. HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 3500 P51(W/O SPECIAL } V FQu� <br /> RCH <br /> AND EQUTORE IPMENT OSBELL DEBRIS,EXCESS EXCAVATION REMOVED AND MAINTAINED CLEAR OFRTHE DRIVEWAYS 2. CONTRACTOR SHALL COORDINATE DELIVERY DATE OF TANKS WITH THE DOCUMENTS. GC.SHALL COORDINATECRETE DESIGN CONCRETE SLAB WORK WL OTHERWISE COMPLY /{FUEL SYSTEM <br /> LLI y y §E <br /> THAT ARE IN USE EACH DAY AND LIGHTED BARRICADES SHALL BE PROVIDED MANUFACTURER,THE OWNER'S CONSTRICTION MANAGER,AND THE PROJECT CONTRACTOR OR FUEL SYSTEM SUBCONTRACTOR. � J Z <br /> FOR THE PUBLIC'S PROTECTION.WHEN IT BECOMES NECESSARY TO CLOSE A SCHEDULE. <br /> DRIVEWAY FOR MORE THAN 24 HOURS,THE CONTRACTOR WILL PROVIDE DISPENSERS 6 n V 0 <br /> 30 U <br /> TEMPORARY TRAVEL SERVICE FOR TRAFFIC. 3. CONTRACTOR TO PROVIDE 'CHAIN LINK SECURITY FENCING AND BARRICADES � aG <br /> DURING ALL CONSTRUCTION PHASES,OR A$DIRECTED BY THE OWNER'S I. PURGE THE AIR FROM THE PIPING SYSTEM USING INDUSTRY STANDARD PRACTICES LL <br /> 12. A COPY OF THE SPECIFICATIONS AND DRAWINGS,ALONG WITH APPROVED SITE CONSTRUCTION MANAGER POST"KEEP OUT"SIGNS ON FENCE EVERY 30 FEET. AT AND A GROUNDED CONTAINER APPROVED FOR STORAGE AND HANDLING CLASS <br /> PLAN,WITH AS-BUILT NOTATIONS,SHALL BE ON SITE AT ALL TIMES. THE END OF EACH WORK DAY SECURE FENCING PANELS TOGETHER. FLAMMABLE LIQUIDS. w � <br /> 13. CONTRACTOR IS RESPONSIBLE FOR ANY PRODUCT IN TANKS AND IN LINES UNTIL 4. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW FUEL EQUIPMENT,TANKS, 2. DISPENSERS SHALL BE SECURELY ATTACHED TO ANCHOR BOLTS WHICH SHALL <br /> LOCATION OPENS OR REOPENS FOR GASOLINE BUSINESS. ANY PRODUCT LOSS PIPING,FUEL SYSTEM CONDUITS,AND ANCILLARY FUEL SYSTEM COMPONENTS. BE SET IN CONCRETE ISLANDS. EXPANSION BOLTS MAY ONLY BE USED WITH THE A$O <br /> DURING CONSTRICTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR WRITTEN APPROVAL OF THE OWNER'S CONSTRUCTION MANAGER. QUANTITY AND �j+ <br /> PRIOR TO PROJECT ACCEPTANCE,THE OWNER SHALL RECONCILE INVENTORY BY 5. WHEN SOIL 15 TO BE STOCKPILED ON SITE FOR SAMPLING PRIOR TO OFF-HAUL, SIZE OF ANCHOR BOLTS SHALL BE AS SPECIFIED IN DISPENSER MANUFACTURER'S Zs <br /> COMPARING PRODUCT IN TANKS AND LINES TO AMOUNT DELIVERED. SHORTAGES FUEL SYSTEM CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL INSTALLATION INSTRUCTIONS.THE DISPENSERS ARE TO BE INSTALLED LEVEL AND _ <br /> SHALL BE BILLED TO CONTRACTOR AT FULL RETAIL PRICE. COVER WITH 4 MIL.PLASTIC UNTIL SOIL IS REMOVED,IN AREA TO BE APPROVED ARE TO BE CAULKED WITH A GRAY SILICONE AT ISLAND/DISPENSER INTERFACE. <br /> BY OWNER/GENERAL CONTRACTOR(G.C.). G.C.SHALL PROVIDE FOR ,� m? <br /> 14. CONTRACTOR MUST PROVIDE ADEQUATE PROVISIONS TO MITIGATE RAIN DAMAGE DISTRIBUTION OF ALL EXCAVATED SOIL,PER GENERAL PROJECT REQUIREMENTS. �01 OF "PET"SHEETS <br />