My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1720
>
2300 - Underground Storage Tank Program
>
PR0547827
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 9:31:32 AM
Creation date
8/1/2022 11:55:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0547827
PE
2351
FACILITY_ID
FA0027253
FACILITY_NAME
CHARTER WAY 76
STREET_NUMBER
1720
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1720 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> COUNTY— <br /> �c G9reQl tress grows her— <br /> Underground <br /> ey—Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: CHARTER WAY 76 Date: 12/30/2022 <br /> Address: 1720 S FRESNO AVE , STOCKTON 95206 <br /> Requestor: SARAH JABLONSKY,WALTON ENGINEERING, INC. Telephone: (916)373-1165 <br /> Program Element: 2303-UST/PIPING INSTALLATION Request#: SR0083599 <br /> Inspection Type: 298-UST RETROFIT REPAIR INSPECTION <br /> Onsite Service Technician: Anthony Reyes ICC Service Tech/Installer Exp. Date: 08/12/2024 <br /> Manufacturer training: VR, 01/14/23; OPW, 05/25/23 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site to witness the following: <br /> -Verified drainage of the spill container <br /> -Verified leak monitoring communication for all installed vacuum, pressure or hydrostatic(VPH)components <br /> -Verified all appropriate test ports were installed <br /> -Verified the dispenser footprints are contained by the LIDC's <br /> -Verified VPH components were installed <br /> -Verified monitoring system functionality <br /> -Water was observed in the 87, 91 and Diesel fill sumps. <br /> -The 87 product smart sensor was replaced on site. <br /> -No piping was observed in the fill sumps. <br /> -Sensor holders were verified as having a gap underneath <br /> This facility is NOT APPROVED to receive fuel. Facility is NOT APPROVED to operate. <br /> Please see permit approval letter dated December 17, 2021 for additional information and inspections required. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of having them <br /> sign. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Emailed to Richard Walton, Installer <br /> EH Specialist: GABRIELA GARCIA-MEJIA Phone: (209)616-3037 <br /> SR0083599 SC298 12/30/2022 <br /> EHD 23-01 Rev.07/05/2022 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.