My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0043444
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BETHANY
>
17350
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0043444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2022 11:19:54 AM
Creation date
8/5/2022 1:34:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0043444
PE
4372
STREET_NUMBER
17350
Direction
W
STREET_NAME
BETHANY
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391-
APN
20915030
ENTERED_DATE
6/30/2022 12:00:00 AM
SITE_LOCATION
17350 W BETHANY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ruvalcaba, Cesar [EHD] <br /> From: Thileepan Rajah <Thileepan.Rajah@ansgeo.com> <br /> Sent: Wednesday,June 29, 2022 12:59 PM <br /> To: EH WellandSepticPermits [EHD] <br /> Cc: Diego Melgar <br /> Subject: RE: San Joaquin County Environmental Health - Well and Pump Permit Application_ <br /> 28JUN2022 <br /> Attachments: Wel l-and-Pump-Perm it-Application_28JUN2022.Rev.1.pdf <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Good Afternoon Cesar, <br /> Thank you for contacting the office. <br /> Sorry, I had something personal come up this morning,so I am working from home. <br /> I left you a voicemail on your phone. <br /> I've updated the application with grout seal depth. <br /> Our Scope of Work includes the following: <br /> • One 100-foot boring <br /> • Ten 50-foot borings <br /> • Three 15-foot borings <br /> • Two temporary wells, which will be removed and grouted before we mobilize off site. <br /> We are scheduled to start the borings on July 18th, 2022 and complete all 14 borings by July 29th, 2022. <br /> The borings will be destroyed/grouted the same or next day each boring is completed. <br /> All borings will be tremie grouted with cement grout and bentonite. <br /> We will install well PVC material in one of the completed boring to the depth of encountered groundwater or maximum <br /> depth of 50 feet. <br /> Once the PVC material is removed,we will grout the borehole. <br /> The temporary well be removed/destroyed and grouted on last day of work, which is July 29th, 2022. <br /> The purpose of this scope of work is to classify the soils for foundation design and construction. <br /> We will be not performing any sampling or testing for soil and groundwater contamination. <br /> I've attached the revised permit with grouting information. <br /> Please let me know if you need anything else from us or feel free to call my cell phone (973-978-0053). <br /> Sincerely, <br /> Thileepan Rajah, PE <br /> Principal Engineer <br /> ANS Geo <br /> Phone: 908-754-8800 Mobile: 973-978-0053 <br /> Email: Thileepan.Rajah(cansgeo.com <br /> Web:www.ans-zeo.com <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.