My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3379
>
2300 - Underground Storage Tank Program
>
PR0547888
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 1:59:27 PM
Creation date
8/11/2022 4:09:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0547888
PE
2351
FACILITY_ID
FA0003287
FACILITY_NAME
7-ELEVEN INC. #41531
STREET_NUMBER
3379
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418021
CURRENT_STATUS
01
SITE_LOCATION
3379 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U) <br /> F- <br /> z <br /> ## KEY NOTES W <br /> 0 <br /> U <br /> Y <br /> 1❑ PAINT VENT PIPES "EXTRA WHITE"SW7006. w <br /> �2 PAINT VENT RACK, BOLLARDS AND ALL OTHER U <br /> 4" STEEL PIPE BOLLARD BY GC, 2 EXPOSED METALS "SEAL SKIN" SW7675. o <br /> FILL WITH CONC. PARGE TOP <br /> n a <br /> SMOOTH AND PAINT SUMP SENSOR TO REST AT LOWEST POINT OF <br /> VENT CAPS TO BE SUMP ENCLOSURE . TANK CONTRACTOR TO c U <br /> VENT CAPS TO BE a) <br /> 12'ABOVE GRADE SUPPLY ALL BRACKETS AND CLAMPS FOR 0 0-112'ABOVE GRADE 2-POINT MOUNTING OF THE 2" FRP SLEEVE. a <br /> Z2 179 L45 AIR BREATHER w <br /> ® P D ASSEMBLY AIR <br /> OVERFILL ALARM SIGNAGE, J11 ® Z28 OVERFILL AUDIBLE/VISIBLE ALARM <br /> (IN/OUT) <br /> REF10-G8.1 OVERFILL ACKNOWLEDGMENT SWITCH ACTIVATED P/N 9948 N N <br /> ALARM N <br /> GC TO ATTACH TO CONDUIT AT 90%TANK CAPACITY. FUEL DELIVERY 12'-0" HT.ATTACH PIPING TO CLEAN AIR <br /> RESTRICTED AT 90%AND AUTOMATICALLYco <br /> ° SEPARATOR PER MANUFACTURE'S 1"TEE WITH o <br /> o EXPLOSION PROOF TERMINATED AT 95/°. ROUTE CONDUIT INSTALLATION INSTRUCTIONS PLUG AND 6" <br /> JUNCTION BOX BY GC WITH SEAL-OFFS TO POWER WIREWAY <br /> CONDUITS FOR OVERFILL &SITE MONITORING SYSTEM NIPPLE <br /> ALARM TO GAS PANEL AND SLOPE 1/8" PER FT <br /> VEEDER ROOT G1 TOWARD VENT � <br /> Proto 12-01-2020 <br /> SEAL-OFF TYPICAL <br /> REFERENCE 1-G1.0 <br /> FOR ORIENTATION GC TO PROVIDE PIPING FOR <br /> OF VENT PIPES CONNECTION OF GAS SYSTEM TO <br /> -III=III=III=III=1 dIluIII=III=III=III-1' VENT SYSTEM <br /> 'i 1=1 11=1 11=1 I I1=1 11=1 11=1 11='' <br /> 1=1 11-1 I S111=1 11=1 I I--' <br /> -111-1 11-1 I 1E 1-1 11-1 I 1=11I co <br /> IEII M11=1 J11=111=111- 9'-0" HT. co <br /> '—III—III ` I—III—I 1I- <br /> 11=III=1 III=III=_ ° ° ° ° ° ° REF SHEETS G12.1 AND Lo <br /> o <br /> co SII-III 1-111- CONCRETE FOOTING G12.2 FOR VACUUM <br /> d PER SPECS- 18" DIA ZONES AND DETAILS Q 1IJ <br /> d SONOTUBE X 36" LONG W M 0 Q <br /> so U Lo J w <br /> 18" 2 z SUM 0 <br /> � o warn z <br /> DIA z Of <br /> W Z <br /> Q = c <br /> 2 "VENT > Q W Z <br /> OVERS ALARM DETARISER LLI <br /> NO SMOKING VINYL SIGNAGE � PIPING W � � Q Q � <br /> 4 /2„ -O„ TYPICAL OF (2) J w Z uj <br /> 1 - FLAMMABLE VAPORS 1 W0� W M ~ ~ <br /> w <br /> ~ v � c <br /> Q w <br /> Ll 10 CD <br /> 0 1 <br /> co <br /> 91 CLEAN AIR <br /> SEPARATOR <br /> 03 <br /> 1 <br /> EXPLOSION PROOF 2 <br /> JUNCTION BOX BY GC ANCHOR PER MANUFACTURER <br /> ® ® ® INSTALLATION INSTRUCTIONS <br /> NOTE: CONTRACTOR TO PROVIDE <br /> ANCHORAGE CALCULATIONS TO <br /> THE CITY BUILDING DEPARTMENT <br /> CONDUIT TO BUILDING FOR Tr <br /> AS A DEFERRED SUBMITTAL <br /> SUMP SENSOR <br /> FINISHED <br /> AIR/VACUUM BY AIR-SERV GROUP, LLC GRADE FINISHED--, s10 <br /> GRADE <br /> d ° d <br /> z 23 <br /> O <br /> ° Q <br /> p p <br /> O 0 d a N m 0 0 <br /> W <br /> ° - rn N <br /> w EXPLOSION PROOF d 04 06 ° U o N F w <br /> W cn 2” BLACK IRON ° ° c 'o o � 2 <br /> o -i JUNCTION BOX BY GC d i CID °' ° y <br /> Q 8"THK CONCRETE SLAB WITH o o 8 v o <br /> o z 90 a d (6)#4 REBAR EACH WAY <br /> VENT RISER PIPING <br /> MINIMUM 4000 PSI CONCRETE FOUNDATION d d ° 1 Z 3 Q <br /> U UNISTRUT, U-BOLT AND d a ° PER MANUFACTURER'S SPECIFICATIONS. ° ° ° o ° o Q o a Q <br /> u- <br /> 0 <br /> O PIPE CLAMP BY GC SEE SPECIFICATIONS FOR SLUMP TEST. GO <br /> 2" ID FIBERGLASS TUBE 54= <br /> 03 d d N <br /> 00 <br /> O W z TO BE BRACKETED TO UNISTRUT in <br /> - <br /> Z W 2" SCHED 40 10„ d <br /> W 3 05 BLACK IRON 16 0 d a <br /> U S10 ELBOW BY GC TYP cn <br /> v <br /> 03 ° cn <br /> U <br /> N <br /> 1 -6 a <br /> ELEVATION SIDE-SECTION N ca <br /> - - <br /> i LR <br /> i i H <br /> i O i O i O O <br /> ', <br /> FRONT -- -- -- _ <br /> 4'-O" 01 00 0 N O Cn <br /> co <br /> 4'-0" CN ~ <br /> O <br /> NOTE: GC TO PROVIDE CONCRETE SLAB LLI z <br /> O <br /> MAXIMUM 2 PERCENT GRADE SLOPE EACH WAY AND UTILITIES.AIR SERV TO PROVIDE w (n <br /> REQUIRED FOR AMERICANS WITH DISABILITIES ACT EQUIPMENT AND MAKE FINAL Q m <br /> CONNECTIONS. `� m <br /> 1. ELECTRICAL NEEDS ARE#10 WIRE (30 AMP)WITH GROUND *k a) U <br /> FILL BOLLARD WITH CONC. o -1-Im <br /> PARGE TOP SMOOTH AND ° o ° O U Co <br /> 6'-0" 01 PAINT ° B o ° ° ° ° ��--_�\ (n 0 0 U <br /> 1'-6" ELECTRICAL STUB-UP WITH O <br /> ELECTRICAL WEATHERPROOF BOX P ® ° p ° ° �� <br /> d 4 W Z <br /> Lu <br /> O W 1 �_ \ \ \ \ ZZ z ¢ 2sT � � <br /> I <br /> (V M IHIM <br /> o _ <br /> ' Q O CONCRETE PAVEMENT ``' \ \ \ \ \ S=2 <br /> L3 ze <br /> cli <br /> CD 2cn TOP OF GRADE <br /> Zvc� � <br /> N <br /> cv TYP75 <br /> Z U LJ ¢ Z <br /> o „ a CONCRETE FOOTING <br /> z PER SPECS- 18" DIA ATTACH PIPING TO CLEAN AIR <br /> Elf SONOTUBE X 36" LONG <br /> SEPARATOR <br /> MANUFACTURE'S---_ <br /> FRONTINSTALLATION INSTRUCTIONS <br /> \ R' <br /> f <br /> 0TYPHO <br /> , 0,�'-'�� � i ��,. . `,i✓ Q� <br /> o <br /> CONIC CURB- REF CIVIL DRAWINGS - <br /> ¢ Qo <br /> ~ UPFRONT PLAN 18 4'-0° 4'-0" (TYP) ��qu//}} <br /> z Yi. <br /> W DIA OFC lA <br /> PLAN <br /> 99 DIA PPE SHEET: <br /> � z VAC ACHNE DETAILS BOLLARD DETAIL T <br /> ANK <br /> VENT RISER SECTIONS <br /> G6 . 0 <br /> I= 3/4 = -0" <br /> w �-1/2"=V-0" 3/4"=l'–O" <br /> FUELING - USA CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.