My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3379
>
2300 - Underground Storage Tank Program
>
PR0547888
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 1:59:27 PM
Creation date
8/11/2022 4:09:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0547888
PE
2351
FACILITY_ID
FA0003287
FACILITY_NAME
7-ELEVEN INC. #41531
STREET_NUMBER
3379
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418021
CURRENT_STATUS
01
SITE_LOCATION
3379 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGRS <br /> SOLUTIONS DELIVERED <br /> February 01 , 2022 iota <br /> ENHANCED LEAK DETECTION <br /> 7- Eleven #41531 <br /> 3379 N . Tracy Blvd . <br /> Tracy , CA 95376 <br /> Subject : Work Plan for IOTA v0050 and iotaVisionT" Pre and Final ELD Testing Services <br /> To Whom It May Concern : <br /> CGRS is pleased to present you with this work plan for pre and final enhanced leak detection ( ELD ) testing services for your <br /> project at the above referenced location . CGRS will utilize the iota VaporTite V005 and iotaVisionT" L005 ( LG 113 ) to <br /> perform the final ELD post installation test as required by the State of California . These test methods have been evaluated <br /> by the California State Water Resource Control Board and determined to meet the performance requirements for post <br /> installation ELD testing ( see LG 162 -3 attached ) . <br /> O Pre Testing will be performed on the primary containment portion of the fueling system with the IOTA test method <br /> while the tank top and product, vent and vapor piping is exposed , prior to backfilling . Any problems encountered <br /> during the pre-testing will be addressed by the installation contractor and retested by CGRS the testing crew . <br /> O Final ELD testing will be performed on all primary fuel containment system components once the fueling system <br /> has been completed ( everything below grade surface ) backfilled , concrete poured , and the system is essentially <br /> ready to receive fuel . This will provide the installation contractor, general contractor, design engineer, site owner <br /> and operator with third party certification that the system is "vapor tight" before it ever receives fuel . <br /> O Final testing with iotaVisionT"' will be performed on all brine filled underground storage tanks and their <br /> compartments thus ensuring that brine is not observed in the primary containment. <br /> CGRS holds a current California Contractors License with a Hazardous Materials endorsement . All final ELD testing will be <br /> performed by a certified IOTA technician holding a current California Tank Tester license . <br /> If you have any questions regarding any aspect of this work plan, please don ' t hesitate to contact me at 1-800-288-2657 . <br /> Sincerely, <br /> cw �`7y <br /> Chris Murphy <br /> Director of CA Operations <br /> CGRS, Inc . <br /> www, cgrs . com 1301 Academy Ct, <br /> 800 , 288 , 2657 Fort Collins , CO 80524 <br />
The URL can be used to link to this page
Your browser does not support the video tag.