Laserfiche WebLink
The cut sheets I have for spill containment is for a OPW 1-1200-EVR direct bury and a OPW Edge Double <br /> Wall Spill Containers. Neither have corresponding part numbers to the application or the plan. <br /> 4) Page 8 of 8 of the Application for Underground Storage Tank Installation Permit: <br /> a. Cut sheets for the sensors,alarm panel, and sumps listed on the application were not provided. <br /> Sumps have their own cut sheets separate from the tanks. I have a snippet below of the tank cut sheet <br /> provided, sumps are not included on it. I also have a snippet of a sample of a sump cut sheet. <br /> LJ <br /> OL <br /> �4W. <br /> ICY / <br /> 5) Provide buoyancy calculations signed by a Professional Engineer. <br /> Sheet GOA is not stamped and signed by a professional engineer. Please provide signed and stamped buoyancy <br /> calculations by a professional engineer.The section that would have the stamp and signature by the professional <br /> engineer is not signed. <br /> ' <br /> 191%P1 OL <br /> Gwrl <br /> G L.1 <br /> #ort ih,.•V5 <br /> 6) Sheet G1.0 does not indicate a RUL 87 (Tank#1) STP sump will be included. <br /> Please provide a copy of the G1.0 with the added note about RUL <br /> 7) Sheet G7.1 does not list the 42"8 sided Xerxes fill and STP sumps shown on sheets G4.0 and G4.1. <br /> I believe sumps come separate from the tanks because you can order round or 8-sided sumps. Please update <br /> G7.1 with the tank sumps to be installed and provide a copy of the updated G7.1 <br /> 8) Provide current contractor's training certifications for installation and testing of all proposed UST <br /> equipment/components. <br /> Please provide this information when contractor is selected <br /> 9) Provide manufacturer's cut sheets for all proposed UST system components. <br /> 11 <br />