Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 DSL <br /> Are both vent and tank riser piping V/ Yes ::H <br /> Yes V/ Yes Yes <br /> secondarily contained? No No 7 No No <br /> OPE Model Veeder Root Veeder Root Veeder Root <br /> What is the OPE response when activated? Shut off Shut off Shut off Shut off <br /> (Check all that apply.) Flow Flow w Flow <br /> estricts estrictsbZtricts Restricts <br /> Flow Flow Flow Flow <br /> Audible Audible 2:1 Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Z Visual V/ Visual 1/ Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yeses Yes" Yes* _J Yes* <br /> that may interfere with the OPE operation? ✓ No No V( No No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank 107 3/B" 106 5/8" 208" <br /> What is the percent capacity of the tank at <br /> 90% 90% 90% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to Yes Yes Yes Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results / Pass Pass �/ Pass Pass <br /> Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />