Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> fi. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) DSL 1 DSL 2 DEF <br /> Are both vent and tank riser piping Yes /J Yes �/ Yes Yes <br /> secondarily contained? lNo No No No <br /> OPE Model Veeder Root Veeder Root Veeder Root <br /> What is the OPE response when activated? Shut off Shut off Shut off Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> estricts estricts estricts Restricts <br /> Flow Flow Flow Flow <br /> Audible 7flAudible Z/ Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> �,/ Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? No �/ No �/ No No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank 107 1/80 107 1/6" e2 1/8" <br /> What is the percent capacity of the tank at <br /> 90% 90gs 90+k <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ✓ Yes A Yes A Yes Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results �/ Pass �/ Pass �/ Pass Pass <br /> Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />