Laserfiche WebLink
Table 3 <br />Estimated Volume of <br />Soil and Debris to be Excavated <br />Palomino Property <br />23023 Santa Fe Road <br />Riverbank, California <br />Parcel 13 <br />TIO, T64 332001 <br />6 <br />199200 <br />7378 <br />35% <br />2582 <br />T12 21000 <br />4 <br />84000 <br />3111 <br />15% <br />467 <br />T14 23600 <br />2 <br />47200 <br />1748 <br />20% <br />350 <br />T15 23900 <br />2 <br />47800 <br />1770 <br />25% <br />443 <br />T16,T16A 26400 <br />1 <br />26400 <br />978 <br />25% <br />244 <br />T63 10500 <br />4 <br />42000 <br />1556 <br />25% <br />389 <br />T24 13100 <br />2 <br />26200 <br />970 <br />25% <br />243 <br />T25 15700 <br />1 <br />15700 <br />581 <br />50% <br />291 <br />T26 5900 <br />4 <br />23600 <br />874 <br />25% <br />219 <br />Total Volume of Soil and Debris (Parcel 13) <br />18967 <br />Total Debris <br />5226 <br />Parcel 14 Excavations to <br />be done concurrent with Parcel 13 <br />T27 <br />7900 <br />8 <br />63200 <br />2341 <br />8% <br />176 <br />T29, T30 <br />20200 <br />6 <br />121200 <br />4489 <br />25% <br />1122 <br />Soil and Debris to be Removed from Parcel 14 <br />6830 <br />Total Debris <br />1298 <br />Notes: <br />Percentage of debris arbitrarily set at 25% if not specifically indicated in trench notes. <br />