Laserfiche WebLink
WORK SITE PLAN RECE I EED <br /> FEB 13 2004 <br /> ENVIRONMENT HEALTH <br /> Lynch/Delta/Palomino PERMIT/SERVICES <br /> APN 13 <br /> 23023 Santa Fe <br /> Riverbank, Ca 95367 <br /> Site Work Plan: <br /> 1.) Consolidate and cap areas(T-1 thru T-13 Areas). <br /> 11.) Cap and close areas(T-14 thru T-25 area). L Peter Palomino will personally <br /> remove all debris found on areas T-14 thru T-25, debris will be taken to <br /> appropriate landfill. <br /> III.) Peter Palomino, and/or immediate family will remove debris, no outside <br /> contractors will be hired. <br /> IV.) Estimated completion date 12/30/04. <br /> Long Term Use: <br /> 1.) Build Ag building as soon as possible. <br /> H.) Change land use to L-2 or L-1, 2,or 3. <br /> III.) Reactivate existing well and install new well. <br /> IV.) Install septic tank. <br /> To Commence on December 1, 2003 <br />