Laserfiche WebLink
LABORATORY: <br />Name: Argon Laboratories <br />Address: Ceres, CA <br />Phone: 581-9280 <br />LEE & PIERCE Inc. <br />CHAIN OF CUSTODY/ANALYSIS REQUIEST FORM <br />LAB PROJECT #: <br />Report to: <br />Bill to: <br />Project Name: <br />Project #: <br />Lee & Pierce Inc. <br />Lee & Pierce Inc. <br />Palomino Property <br />EN07599 <br />Indicate Anal is Requested <br />546 Abbott St., Ste. 20 <br />546 Abbott St., Ste. 20 <br />Tele: 831-758-0096 <br />Contact: <br />In <br />Salinas, CA 93901 <br />Salinas, CA 93901 <br />Fax: 831-758-1213 <br />John Lane <br />y <br />Sampled byi nature) <br /># of samples <br />Date ofrhipment: <br />Date results needed: <br />1-- <br />1'— <br />% <br />N <br />EL <br />= <br />Q <br />^ <br />Z <br />MATRIX <br />SAMPLING <br />_ <br />Q <br />m <br />r <br />m <br />SAMPLE NO. <br />LOCATION/DESCRIPTION <br />2 <br />2 o <br />to <br />0 <br />o <br />Q <br />m <br />CLQ <br />y� <br />O <br />1T <br />N <br />I <br />Go <br />Go <br />cow <br />00 <br />0. z <br />w <br />W <br />W <br />W <br />W <br />I w <br />w= <br />fls <br />1 <br />SP1 -A <br />Soil Pile 1, north <br />x <br />111307 <br />11:20 <br />Brass <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Tube <br />2 <br />SP1 -B <br />Soil Pile 1, east <br />X <br />111307 <br />11:27 <br />Brass <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Tube <br />3 <br />SP 1-C <br />Soil Pile 1, south <br />111307 <br />11:34 <br />Brass <br />y <br />It <br />(�? <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Tube <br />4 <br />SP1 -D <br />Soil Pile 1, west <br />X <br />111307 <br />11:38 <br />Brass <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Tube <br />5 <br />SP2-A <br />Sail Pile 2, north <br />X <br />111307 <br />10:58 <br />Brass <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Tube <br />6 <br />SP2-13 <br />Soil Pile 2, east <br />X <br />111307 <br />11:07 <br />Tube <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />{, ' <br />SP2-C <br />Soil Pile 2, south <br />X <br />111307 <br />11:11 <br />Brass <br />o <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Tube <br />A <br />8 <br />SP2-D <br />Soil Pile 2, west <br />x <br />111307 <br />11:15 <br />u <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />9 <br />0 <br />Released b (signature) <br />DaterTime: <br />Received b (signature) <br />Daterrime: <br />Shleped <br />Via: <br />Condition Noted: <br />Turn Around Time: Mtandard O Rush (specify): <br />Comments/Special Instructions: Please composite in the lab SP1-A,B,C,D (4:1) and SP2-A,B,C,D ql <br />Email results to John Lane at jlane@leeandpierce.com <br />(`•\Inhe\AilminUrnnl.toe\I P('(X' 1 Anr <br />C7 <br />