Laserfiche WebLink
�J <br />Mr. Robert McClellon <br />September 22, 2004 <br />Page 10 of 11 <br />Heat Stress <br />With the possible combination of ambient factors such as high air temperature, low air <br />movement, high radiant heat, and protective clothing, the potential for heat stress is a concern. <br />All on-site personnel will be made familiar with the symptoms of heat stress and the conditions <br />during which they may occur. Heat stress symptoms may include elevated heart rate, nausea, <br />headache, lightheadedness, and lack of coordination or decreased job performance or slurred <br />speech. <br />If a heat stress condition develops, Mr. Palomino will monitor for heat stress. Site personnel <br />shall follow the appropriate work practices and monitor their potential heat stress condition. At a <br />minimum, workers will break every 2 hours for 10 to 15 minute rest periods. In addition, <br />workers are encouraged to take rests whenever they feel any adverse effects, especially those <br />effects that may be heat -related. The frequency of breaks may need to be increased, as needed. <br />Also, if resting pulse rates exceed 110 beats after a 3 -minute waiting period, then additional <br />breaks will be taken. Workers are encouraged to drink small volumes of cool water about every <br />20 minutes for rehydration. <br />Noise Hazards <br />Employees may not be exposed to noise greater than the levels established by Cal/OSHA <br />(90dBA TWA for an 8 hour day). If levels are higher than this, engineering, administrative, or <br />work practice controls are required. When the noise levels cannot be controlled through these <br />methods hearing protection will be provided. <br />TASK <br />DATE <br />Drill and sample soil borings to evaluate soil and shallow groundwater <br />beneath the site <br />Completed July 2004 <br />Install new water supply well <br />October 2004 <br />Destroy new water supply well <br />November 2004 <br />Excavation and disposal of surface and buried waste <br />January -June 2005 <br />Surface grading and erosion control measures <br />January -June 2005 <br />Consolidate and cover waste in northern corner of site <br />January -June 2005 <br />Submit report summarizing_site activities <br />September 2004 <br />Excavate and dispose of waste along RR berm in Parcel 14 <br />To Be Determined <br />Submit report summarizing disposition of waste along RR berm in <br />Parcel 14 <br />To Be Determined <br />G:\GROUNDZE\Palomino\wpjitemitfiiial.doc <br />