My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
19533
>
2300 - Underground Storage Tank Program
>
PR0547762
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 2:55:46 PM
Creation date
9/1/2022 9:00:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0547762
PE
2351
FACILITY_ID
FA0027204
FACILITY_NAME
SAFEWAY FUEL CENTER #0055
STREET_NUMBER
19533
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
01
SITE_LOCATION
19533 S MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
btssc.com <dan@btssc.com>; service btssc.com <service@btssc.com>; construction btssc.com <br /> <construction@btssc.com>; Keith Powers<Keith.Powers@albertsons.com> <br /> Subject: RE: SAFEWAY 5816 MTN HOUSE- MC RESULTS <br /> Hi Krystinah, <br /> All test results should be submitted to the UST email— UST@sigov.org . Please submit the test results there for <br /> processing.We no longer accept test results submitted directly to inspectors and must go through the UST email for <br /> processing. <br /> Regarding the results. I noticed they are dated 9/26/2022 for certification for all of the sensors and it says they all <br /> passed. We did the monitoring system certification on 9/23/2022 but S10 and S16 didn't pass high liquid and I don't <br /> recall doing a full test on all the sensors on 9/26/2022. On 9/26/2022 we tested S10 and S16 which passed for high <br /> liquid. I also noticed the spill container results were for 9/14/2022,was that a typo since we did spill container testing on <br /> 9/15/2022?We also did overfill that same day 9/15/2022. <br /> So I would expect to get: <br /> - Monitoring system certification results for 9/23/2022 marking no to "Are all sensors installed to detect a release <br /> at the earliest opportunity in the secondary containment?" and S10 and S16 marked as a fail and a note in <br /> section 9 that S10 and S16 did not alarm for high liquid. <br /> - Monitoring system certification results for 9/26/2022 for S10 and S16 showing they passed. This one would <br /> probably be marked as "repair" because I believe the sensors were replaced. <br /> - Spill container results for 9/15/2022 <br /> - Overfill prevention equipment results for 9/15/2022 <br /> Also per CCR 23 §2637. (a)(1)(A) secondary containment test should be conducted six months after installation. Six <br /> months from installation would be March 2023. Please ensure secondary containment gets conducted by March 2023. <br /> Thanks! <br /> All the Best, <br /> Carol Presto <br /> Registered Environmental Health Specialist <br /> San Joaquin County Environmental Health Department <br /> Email: cpresto@sigov.org I Direct: (209) 616-3061 1 Main: (209) 468-3420 <br /> https://www.s6gov.org/department/envhealth/ <br /> *Test notifications, test results and inspection requests should be sent to the general UST email: ustPs'g�ou.org* <br /> *NOTE* I will be out of office every other Friday: <br /> 2022 2023 <br /> November 11,25 1 December 9,23 January 6, 20 1 February 3, 17 i March 10, 24 1 April 7, 21 <br /> From: Krystinah Tarasevic<krystinah@btssc.com> <br /> Sent: Friday, November 4, 2022 4:37 AM <br /> To: Presto, Carol [EHD] <cpresto@sigov.org> <br /> Cc:fabio btssc.com <fabio@btssc.com>; les btssc.com <les@btssc.com>;jeff btssc.com <ieff@btssc.com>; clan <br /> btssc.com <dan@btssc.com>; service btssc.com <service@btssc.com>; construction btssc.com <br /> <construction@btssc.com> <br /> Subject: SAFEWAY 5816 MTN HOUSE- MC RESULTS <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.