My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1110
>
2300 - Underground Storage Tank Program
>
PR0547873
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 11:37:08 AM
Creation date
9/6/2022 3:22:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0547873
PE
2361
FACILITY_ID
FA0000794
FACILITY_NAME
7-ELEVEN INC # 41530
STREET_NUMBER
1110
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21821023
CURRENT_STATUS
03
SITE_LOCATION
1110 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dispens <br /> Conductors of the low voltage circuits are not <br /> The Problem disconnected by the emergency stop operator. <br /> The conductors of all circuits including low <br /> While sites may have an emergency stop voltage,intercom and data circuits are to be <br /> button, the emergency stop system that it disconnected simultaneously from the <br /> controls does not meet the current safety source of supply(514.11) <br /> requirements defined i the National ..-_ <br /> Electrical Code®(NEC ). 5 Emergency <br /> 7Intercom Circuits Petroleum Stop Opera- <br /> Non-compliance with Power Panel for <br /> NEC R 514.11 and 514.13 Data Circuits i <br /> can create fire, ignition, — — — — — — — — I I <br /> and safety hazards at <br /> petroleum dispensing I <br /> stations during emergency Power Circuits Nli ilk <br /> situations and during <br /> maintenance of fueling Contactor or <br /> dispensers. n <br /> hunt Trip <br /> The Solution Breaker <br /> Power Integrity's Dispenser Wiring DisconnectTM :di:sconnect <br /> r or shuis used to <br /> power m panel. <br /> thods dect dis- <br /> wer cirors from thef su 1 <br /> Typical Installation <br /> Dispenser Wiring Disconnect TM Solution Intercom System <br /> The Dispenser Wiring DisconnectTm has disconnects dispenser data wiring for s%J)I J)I <br /> been designed to be installed inline with compliance with NEC Article 514 Dispenser Wiring <br /> dispenser data wiring and adjacent to the <br /> Ell (mill DisconnectTM Solution <br /> site controls. '��' Expansion disconnects <br /> dispenser intercom <br /> Dispenser Forecourt Site Controlswiring for compliance <br /> The system provides individual service M with NEC Article 514 <br /> disconnect switches. Each switch ��J <br /> disconnects both the corresponding <br /> IN <br /> dispenser data and credit card data T" ' `°" <br /> x <br /> circuits. M I For more <br /> information <br /> ask for Power <br /> When used in conjunction with a Power a Integrity <br /> Integrity AC power system such as the 4 r. document <br /> 91-7003 <br /> PetroXSTM (PXS)or Petro Power <br /> Solution <br /> TM (PPS), all equipment Dispenser Dispenser <br /> requirements for installing the petroleum Data Intercom <br /> dispensing system have been addressed Wiring wiring <br /> making it a simple task for the installer to <br /> Trough Trough <br /> meet the necessary code requirements. <br /> This product is protected by U.S. Patent No. 8,030,803 <br /> Tr Power Integrity Corporation <br /> PO INTEGRITY1834 Pembroke Road <br /> PS-1163 Rev D Greensboro, NC 27408 <br /> 336-379-9773 <br /> www.powerintegritycorp.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.