My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1110
>
2300 - Underground Storage Tank Program
>
PR0547873
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 11:37:08 AM
Creation date
9/6/2022 3:22:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0547873
PE
2361
FACILITY_ID
FA0000794
FACILITY_NAME
7-ELEVEN INC # 41530
STREET_NUMBER
1110
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21821023
CURRENT_STATUS
03
SITE_LOCATION
1110 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.07 Acceptable Products - RED THREAD IIA Piping Secondary Containment Piping <br /> System as manufactured by NOV Fiber Glass Systems or <br /> engineered approved equal. SECTION 1 - Scope <br /> This section covers the use of fiberglass reinforced plastic <br /> SECTION 4 - Installation and Testinci (FRP) pipe for fuel handling and fuel handling vent and vapor <br /> 4.01 Training and Certification - All joints installed or applications including gasoline, unleaded gasoline, gasoline/ <br /> constructed in the field shall be assembled by employees alcohol mixtures, bio-diesel and diesel that require secondary <br /> of the contractor who have been trained by the pipe containment. <br /> manufacturer. The pipe manufacturer or their authorized <br /> representative shall train the contractor's employees in the SECTION 2 - General Conditions <br /> proper joining and assembling procedures required for the <br /> project, including hands-on participation by the contractor's 2.01 Coordination - Material furnished and work <br /> employees. Each bonder shall fabricate one pipe-to-pipe performed under this section shall be coordinated with the <br /> and one pipe-to-fitting joint that shall pass the minimum related work and equipment specified under other sections, <br /> pressure test for the application as stated in Section 2.03 i.e.Valves, Flexible Connectors, Equipment. <br /> without leaking. <br /> Only bonders that have successfully completed the 2.02 Governing Standards - Except as modified or <br /> pressure test shall bond pipe and fittings. Each bonder shall supplemented herein, all materials and construction methods <br /> carry a current manufacturer's proof of training card. shall comply with and be tested in accordance with the <br /> 4.02 Pipe Installation - Pipe shall be installed as specified following standards and test methods: <br /> and indicated on the drawings. <br /> The piping system shall be installed in accordance with the Standards and Test Methods: <br /> manufacturer's current published installation procedures. UL971 Standard for Nonmetallic Underground Piping for Flam- <br /> 4.03 Testing - A hydrostatic pressure test shall be 2004 mable Liquids <br /> conducted on the completed piping system. The piping <br /> system shall be subjected to 10 pressurization cycles from 0 ASTM Standard Classification for Machine-Made"Fiberglass" <br /> psig to 1.5 times the design operating pressure as stated in D2310 (Glass Fiber Reinforced Thermosetting Resin)Pipe <br /> Section 2.03.c. After the 10 cycles, the pressure shall be held ASTM Standard practice for obtaining Hydrostatic or Pressure <br /> on the system for a minimum of 1 hour and the line inspected D2992 Design Basis for "Fiberglass" (Glass Fiber Reinforced <br /> for leaks. Thermosetting Resin) Pipe and Fittings <br /> Test pressures shall not exceed 1.5 times the maximum <br /> rated pressure of the lowest rated element in the system. 2.03 Operating Conditions - In addition to the above <br /> All pipe joints shall be water tight. All joints that are found listed minimum design requirements, the system shall meet <br /> to leak, by observation or during testing, shall be replaced by the following minimum operating conditions: <br /> the contractor and retested. a. Operating Pressure <br /> Should hydrostatic testing be impractical, testing with b. Fluid Conveyed <br /> low pressure air or inert gas may be acceptable. Extreme c. Test Pressure <br /> caution should be used when testing with air. Follow all <br /> safety precautions and testing recommendations of the pipe 2.04 Quality Assurance - Pipe manufacturer's quality <br /> manufacturer. program shall be in compliance with ISO 9001 and/or API Q1. <br /> 2.05 Delivery. Storage. and Handling - Pipe and fittings <br /> shall be protected from damage due to impact and point <br /> loading. Pipe shall be properly supported to avoid damage <br /> due to flexural strain. The contractor shall not allow dirt, <br /> debris or other extraneous materials to get into pipe and <br /> fittings. All factory machined areas shall be protected from <br /> sunlight until installed. <br /> 2.06 Acceptable Manufacturers - NOV Fiber Glass <br /> Systems, 501-568-4010, or approved equal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.